When inspection reveals that an existing chimney is not safe for the intended purpose, it shall be rebuilt to conform to nationally recognized standards, lined or relined with suitable materials, or replaced with a gas vent or chimney suitable for venting. The chimney passageway must be checked periodically to ensure that it is clear and free of obstructions. Do not install a manual damper, barometric draft regulator, or flue restrictor between the furnace and the chimney. Never connect a Catego
intake or exhaust pipe length. What is the altitude? 7 Furnace capacity? FIGURE 21 MINIMUM VENT PIPE LENGTHS IMPORTANT Do not use screens or perforated metal in exhaust or intake terminations. Doing so will cause freeze-ups and may block the terminations. *Any approved termination may be added to the minimum length listed. **This gas furnace must have 3” to 2” reducing ell (supplied or field replacement Canadian kit) installed directly into unit flue collar. TABLE 4 506724-01 Issue 1108 Page 17
EXHAUST VENT INTAKE AIR Side View FIGURE 30 DIRECT VENT CONCENTRIC ROOFTOP TERMINATION 71M80, 69M29 or 60L46 (US) 44W92 or 44W93 (Canada) Minimum Above Average Snow Accumulation SHEET METAL STRAP (Clamp and sheet metal strap must be field installed to support the weight of the termination kit.) FLASHING (Not Furnished) CLAMP FIELD.PROVIDED REDUCER MAY BE REQUIRED TO ADAPT LARGER VENT PIPE SIZE TO TERMINATION 1 1/2" (38mm) accelerator provided on 71M80 & 44W92 12” (305mm) INTAKE AIR EXHAUST VENT
When you see this symbol on labels or in manuals, be alert to the potential for personal injury or death. CAUTION WARNING As with any mechanical equipment, personal injury can result from contact with sharp sheet metal edges. Be careful when you handle this equipment. Improper installation, adjustment, alteration, service or maintenance can cause property damage, personal injury or loss of life. Installation and service must be performed by a licensed professional installer (or equivalent), serv
IMPORTANT Once the venting system is installed, attach the “Disconnected Vent” warning sticker to a visible area of the plenum near the vent pipe. See Figure 23. The warning sticker is provided in the bag assembly. Order kit 66W04 for additional stickers. WARNING Asphyxiation hazard. The exhaust vent for this furnace must be securely connected to the furnace flue transitiion at all times. Vent Connection Figure 23 Use self drilling sheet metal screws or a mechanical fastener to firmly secure the
After the main burner has operated for 5 minutes, test for leaks of flue gases at the draft hood relief opening. Use the flame of a match or candle. After determining that each appliance connected to the common venting system is venting properly, (step 3) return all doors, windows, exhaust fans, fireplace dampers, and any other gas burning appliances to their previous mode of operation. If a venting problem is found during any of the preceding tests, the common venting system must be modified to
...your outdoor heating/cooling package unit is a valuable piece of equipment, designed and manufactured by the most modern methods. Proper care of your unit should result in many years of service and comfort. To keep your operating costs low and to eliminate unnecessary service calls, we have provided a few guidelines. These guidelines will help you understand how your heating/cooling unit operates and how to maintain it so you can get years of safe and dependable service. Read all the instruct
3 Furnace Wiring Specifications .......................... 5 Introduction ....................................... 6 Location/Placement.................................. 7 Air for Combustion & Ventilation ........................ 8 Ducting .......................................... 11 Venting .......................................... 12 Electrical Connections................................ 15 Gas Connections ................................... 16 Control Board & Variable Speed Motor Features .
Cement should be applied lightly but uniformly to inside of socket. Take care to keep excess cement out of socket. Apply second coat to end of pipe. 7. Immediately after applying last coat of cement to pipe, and while both inside socket surface and end of pipe are wet with cement, forcefully insert end of pipe into socket until it bottoms out. Turn PVC pipe 1/4 turn during assembly (but not after pipe is fully inserted) to distribute cement evenly. Do not turn ABS or cellular core pipe. NOTE: As
9. After determining that each appliance remaining connected to the common venting system properly vents when tested as indicated in step 3, return doors, windows, exhaust fans, fireplace dampers and any other gas burning appliance to their previous condition of use. 506724-01 Issue 1108 Page 45 of 57 Page 46 of 57 Issue 1108 506724-01 Other Unit Adjustments Primary Limit The primary limit is located on the heating compartment vestibule panel. This limit is factory set and requires no adjustment