Iniciar sesión:
Votos - 1, Puntuación media: 3 ( )

Manual de usuario Armstrong World Industries, modelo 57205

Fabricar: Armstrong World Industries
Tamaño del archivo: 202.97 kb
Nombre del archivo:
Idioma del manual:en
Enlace gratuito para este manual disponible en la parte inferior de la página



Resumen del manual


These ratings are provided only for use in the selection of products to meet the specified limits. INSTALLATION Job Conditions Subfloors/underlayments shall be dry, clean, and smooth. They shall be free from paint, varnish, solvents, wax, oil, existing adhesive residue, or other foreign matter. For more detailed requirements of concrete, wood and metal subfloors, as well as wood and trowelable underlayments, refer to Armstrong Guaranteed Installation Systems manual, F-5061. Calcium Chloride Tests for moisture must be conducted. Armstrong offers a guideline of a maximum acceptable moisture emission level of 5.0 lbs. per 1000 sq. ft. per 24 hours. Bond Tests should also be conducted for compatibility with the substrate. When testing for alkalinity, the allowable readings for the installation of Armstrong flooring are 5 to 9 on the pH scale. Temperature shall be maintained at a minimum of 65° F (18° C) and a maximum of 100° F (38° C) for 48 hours prior to installation, during installation and 48 hours after completion. A minimum temperature of 55° F (13° C) shall be maintained thereafter. Condition all flooring materials and adhesives to room temperature at least 48 hours prior to starting installation. Protect all materials from the direct flow of heat from hot-air registers, radiators, or other heating fixtures and appliances. Procedure These products should be installed with the following adhesives: Subfloor Wood Underlayment Concrete Ceramic, Marble, Terrazzo Metal Existing Resilient Floor Adhesive S-515 S-700 S-750 S-89 S-515 S-700 S-750 S-89 S-515 S-700 S-750 S-89* S-700 S-515 S-750 Tile-On™ *S-89 may only be used over steel, stainless steel, aluminum and lead. NOTE: Install each ARTEFFECTS tile with the arrows pointing in the same direction for a nondirectional look. Detailed instructions may be found in the Armstrong Guaranteed Installation Systems manual, F-5061. MAINTENANCE These products are designed to be maintained by traditional resilient flooring maintenance methods, which include the use of polishes, spray-buffing techniques and appropriate high–speed maintenance systems. Initial Maintenance Immediately After Installation ¦ Sweep or vacuum thoroughly. ¦ Damp mop with a dilute neutral detergent solution such as Armstrong S-485 Floor Cleaner – carefully wiping up black marks and excessive soil. ¦ Apply two coats of high quality commercial floor polish such as Armstrong S-480. ¦ Do not wash, scrub or strip the floor for at least four to five days after installation. Preparation for Commercial Use For specific, ongoing maintenance procedures see Armstrong Maintenance Recommendations & Procedures for Commercial Resilient Flooring booklet, F-8663. WARRANTIES Armstrong warrants its regular (first quality) commercial floors and wall base to be free from manufacturing defects and warrants the installation integrity for five years from the date of purchase, if installed according to the Armstrong Guaranteed Installation Systems manual, F-5061....

Otros modelos de este manual:
Interior - 57203 (202.97 kb)
Interior - 57210 (202.97 kb)
Interior - 57215 (202.97 kb)
Interior - 57200 (202.97 kb)

Comentarios



Tu reseña
Tu nombre:
Introduzca dos números de la imagen:
capcha





Categoría