Iniciar sesión:
Votos - 2, Puntuación media: 4.5 ( )

Manual de usuario Craftsman, modelo 247.795861

Fabricar: Craftsman
Tamaño del archivo: 1011.24 kb
Nombre del archivo: 3143f7cb-7b0c-4477-a85f-5b7f1ad4128f.pdf
Idioma del manual:en
Enlace gratuito para este manual disponible en la parte inferior de la página



Resumen del manual


11, 12 Chipper-Shredder ......................................................................... 11 4 ASSEMBLY mNSTRUCTmONS . IMPORTANT: This unit is shipped WITHOUT GASO_ LINE or OIL After assembly, see operation section of this manual for proper fuel and engine oil recommendation& NOTE: To determine right and left hand sides of your ...Fla.t-"_/'-,f'_'_ chipper-shredder, stand behind and face the hopper 5_l_Sl]el_ k_,,,.._) (engine is at the front of the unit) • _ _ Your chipper-shredder has been completely assem- I II bled at the factory, except for the hopper assembly I I_ (hopper hood and upper leaf ramp section have been I II sub-assembled), upper guide assembly, chute deflec! ]_ tor and the catcher bag The hardware pack and safe- I tl ._ ty glasses are also included in the carton I] [/_._'_]-<'-Hex Lock The hardware pack contains the parts shown in figure II [l_..)))1 Nut 5/16-18 1 (shown full size) 1_ Thread b il TOREMOVEFROM CHIPPER-SHREDDERCARTON I !l Cut the corners of the carton Remove all packing I II ..... inserts Roll chipper-shredder out of the carton Make I 11----5110-1_e'.-%1°. :'Loog certain all parts and literature have been removed I !J before the carton is discarded I II TOOLS REQUIREDFOR ASSEMBLY I II (1) Phillips Screwdriver I II (2)1/2"or Adjustable Wrenches I / (2) 7/16 or Adjustable Wrenches I i I__ M [] [] I_-TrusoM°chi°eScrews I L .e LockNu,a FIGURE 1. Spacers Housing Assembly Hinge) Chute Deflector Hex Lock- Nut Hand FIGURE 2. StopWasher Upper Guide Release Assembly Bar 8-3/8" Long Flat Washer Frame Hex Lock Nut FIGURE 3. Hopl: Assembly Hopper Pivot Door ASSEMBLE THIS TRUSS SCREW AND NUT FIRST pperLeaf RampBar Section Remove Truss Screw and Nut Jper Guide Assembly FIGURE 4. , Drawstring ./ 'Plunger FIGURE 5. HOWTOSET-UPYOURCHIPPER-SHREDCER MAKE CERTAIN THE SPARK PLUG WIRE IS DISCONNECTED AND MOVED AWAY FROM THE SPARK PLUG BEFORE ASSEMBLING THE CHIPPER SHREDDER. _-A'I-rACHING THE CHUTE DEFLECTOR e Remove the hand knobs and cupped washers from each side of the discharge opening on the left side of the chipper-shredder e Remove hex lock nut, two spacers and hex bolt from inside the hinge on top of the housing assembly Do not remove one spacer from the hex bolt e Place the chute deflector in position on the discharge opening Insert hex bolt and spacer through hinge on chute deflector and housing (spacer fits inside of hinge). See figure 2. ® Place second spacer over hex bolt, inside other part of hinge. Secure with hex lock nuL Tighten securely. e Secure both sides of chute deflector to housing using hand knobs and cupped washers (cupped side of washers go against chute deflector) -<-ATTACHING THE UPPER GUIDE ASSEMBLY Place upper guide assembly in position on frame, making certain edges of the upper guide assembly are underneath stop washers, and the release bar is in the slots= See figure 3 Insert hex bolt 8-3/8" long through upper guide assembly and frame Secure with flat washer and hex lock nuL NOTE: Make certain upper guide assembly can pivot by pulling up on release bar and lowering upper guide assembly If necessary, loosen hex lock nut a turn or two Put the upper guide assembly back into the raised position, "_-ATTACHING THE HOPPER ASSEMBLY Your chipper-shredder has been shipped with the upper leaf ramp section attached to the hopper assembly See figure 4 Attach the hopper assembly to the upper guide assembly as follows. Be certain to place heads of all truss machine screws inside of hopper assembly_ • Remove one truss machine screw and nut from each side of hopper assembly as shown in figure 4. Push hopper pivot door down inside lower part of hopper as you place hopper assembly (both pieces) inside upper guide assembly_ Replace truss screws and nuts just removed, using the hole shown in figure 4, one on each side Tighten finger tight only e Place the six truss machine screws and nuts found in hardware pack in the remaining holes of hopper assembly, alternating sides of the unit and tightening finger tight only • After assembling all eight screws, tighten them securely <-ATTACHING THE CATCHER BAG Your chipper-shredder is equipped with a catcher bag to catch the shredded material 6 e To attachthe bag,placethe opening of the bag string, and pull on the drawstring until the bag is over the chute deflector so it completely covers the tight around the chute opening. Release plunger to chute opening. Depress the plunger on the draw-lock it into position See figure 5, OPERATnON KNOWYOURCHIPPER-SHREDDER READ THIS OWNER'S MANUAL AND SAFETY RULES BEFORE OPERATING YOUR CHIPPER-SHREDDER_ Compare the illustrations with your chipper-shredder to familiarize yourself with the location of various controls and adjustments Save this manual for future reference Hopper Assembl Chipper Chute Fuel Tank Oil Fill Release Dipstic Bar Engine Chute Deflector Switch Choke Lever. Starter Handle Bag FIGURE 6--Model 247.795861 Shown. MEETSANSISAFETYSTANDARDS Sears chipper-shredders conform to the safety st...


Comentarios



Tu reseña
Tu nombre:
Introduzca dos números de la imagen:
capcha





Categoría