Iniciar sesión:
Votos - 2, Puntuación media: 3 ( )

Manual de usuario Marley Engineered Products, modelo 1800

Fabricar: Marley Engineered Products
Tamaño del archivo: 92.78 kb
Nombre del archivo: q-mark-2543w.pdf
Idioma del manual:en
Enlace gratuito para este manual disponible en la parte inferior de la página



Resumen del manual


(Maximum 3/4” (19mm) thick). 1. Remove wiring compartment cover at end of heater where power supply cable is to enter. Determine desired mounting location (Figure 2), position heater to wall as intended and mark wall (or floor) at location where power supply is to enter heater. Figure. 2 2 2. Drill hole entry. Install location as approximately for connections. 3. If any other heater, refer accessory 4. Wireway - a. The wireway commercial baseboard heaters. vidual through rent loads. b. To gain remove knockouts c. Insert compartment) d. Wire cover 5. Loosen screw desired knockout 3 and 4). ing at least To install bend tab wiring compart install approved knockout. 6. Position heater a guide, see predrilled each end to allow carpet mounting This will allow not span CAUTION ! Figure 4. NOTE: Make sure the caution label with the word “TOP” is at the top of the heater For most efficient operation locate heaters along outside secured to wall stud. of the knockouts wiring diagram sup- If front cover was removed, reinstall by hooking the top edge Then push down to latch onto the thermostat for installa- 6 for typical ther- to the bare copper coming to the heater the desired wiring connect the power supply BOTTOM MOUNTING HOLES prevent a possible drive the screws TOP MOUNTING PERFORATIONS Double Line Break Thermostat L2 L1 Breaks in “OFF” position Breaks on temp. rise and in “OFF” position Double line break thermostats have an “OFF” switch that is open only when the thermostat is put in the “OFF” position To heater Power supply Single Line Break Thermostat L2 L1 (HOT) Breaks on temp. rise Single line break thermostats DO NOT have an “OFF” position and will operate at a temperature below its minimum set point To heater Power supply (1 Figure. 3 Wiring Compartment Dimensions 6.75 (153,2) CAUTION ! Figure 4. NOTE: Make sure the caution label with the word “TOP” is at the top of the heater For most efficient operation locate heaters along outside secured to wall stud. of the knockouts wiring diagram sup- If front cover was removed, reinstall by hooking the top edge Then push down to latch onto the thermostat for installa- 6 for typical ther- to the bare copper coming to the heater the desired wiring connect the power supply BOTTOM MOUNTING HOLES prevent a possible drive the screws TOP MOUNTING PERFORATIONS Double Line Break Thermostat L2 L1 Breaks in “OFF” position Breaks on temp. rise and in “OFF” position Double line break thermostats have an “OFF” switch that is open only when the thermostat is put in the “OFF” position To heater Power supply Single Line Break Thermostat L2 L1 (HOT) Breaks on temp. rise Single line break thermostats DO NOT have an “OFF” position and will operate at a temperature below its minimum set point To heater Power supply (1 Figure. 3 Wiring Compartment Dimensions 6.75 (153,2) ! WARNING wire connections are 3 OPERATION 1. After the baseboard system has been completely installed, all thermostats should be turned to LOW or NO HEAT. Then turn on breakers. Wait 3 to 5 minutes and check to see that none of the heaters are operating. If operating, disconnect power and check wiring. If none are operating then turn thermostats to highest position and wait 3 to 5 minutes. Check to see that all heater(s) are operating. Should any not be operating, disconnect power and check wiring. 2. Al...

Otros modelos de este manual:
Eléctrico - 2500 (92.78 kb)
Eléctrico - C1800 (92.78 kb)
Eléctrico - C2500 (92.78 kb)

Comentarios



Tu reseña
Tu nombre:
Introduzca dos números de la imagen:
capcha





Categoría