|
Resumen del manual
Gas Valve Blower Black XFMR L 1 Circulating Draft Black Inducer Yellow Yellow EAC/LSPD Blower White Heat Black Red W Hum Ignitor M 1 C M 2 White R Thermostat Y Flame Yellow Sensor Yellow Neutrals 115 VAC Draft White Transformer Primary Inducer White 24 VAC Black Transformer White Flame Green Secondary Sensor 24 VAC 3 Amp White Fuse Brown High Limit Black Thermostat Limit Pressure GasMODEL HEDV 403, 404 Switch Switch Valve Page 12 SEQUENCE OF OPERATION - HEDV403/4 @t=0 @t=X THERMOSTAT Thermostat CALLS FOR is satisfied HEAT t=10 sec. t=15 sec. t=20 sec. t=50 sec. t=x sec. t=X+15 sec. t=X+120 sec. Power to Combust. Fan Fan Proved YES Power to Ignitor Gas Flow IGNITION PROVED? YES Blower On Burners OffCombust. Fan Off Blower Off NO NO NO 10 SEC PURGE YES Three Attempts Made? 10 SEC PURGE NO Three Attempts YES Made? STEP # STEP # 1) Thermostat calls for heat. 8) Continued... 2) Combustion fan turns on. return to Step 2. If after 3 attempts 3) Pressure switch closes. malfunction still occurs, furnace will 4) Power to Ignitor. go into lockout mode for one hour. 5) Ignitor warm up period. This one hour mode can be bypassed 6) Gas flow to burner. by resetting thermostat. 7) Burner ignition proven. 9) Thermostat satisfied. 8) Circulating blower on. 10) Gas valve closes. NOTE: If there is a mal11) Combustion fan off. function in any of the 12) Blower off. above steps, the sequence will stop at that point and HEATER NOW IN STAND-BY MODE. Page 13 HEVK-5 5’ VENT EXHAUST KIT INSTALLATION INSTRUCTIONS WARNING: Use only Louisville Tin & Stove Company factory supplied parts and kits. Failure to do so could result in loss of life, personal injury, property damage, or unsatisfactory performance. CONTENTS OF KIT 1 only P/N 72532 2”x3” Steel Coupling 1 only P/N 41520 Center Bracket 1 only P/N 72575 2”x5’ Black Flocked Tube 8 only P/N 72593 2” Hose Clamps 1 only P/N 72612 2”x6’ Black Flex Tubing 1 only P/N 72578 2”x3” Black Silicone 2 only P/N 41515 Support Brackets Wrapped Coupling STEP 1 - LOCATE VENT OPENING a) Select location on outside wall that vent will exit through. b) Check outside for proper clearances around vent cap. See installation instructions. c) Mark and cut 3-1/2” hole through both inside and outside walls, being sure to maintain level across both openings. d) Measure wall thickness. Mark and cut off both intake and exhaust pipes to 1/2” beyond outside wall. e) Secure collection box to wall. Wall anchors, not provided, may be required. STEP 2 - INSTALL HEATER a) Select location on wall where heater will be installed. b) Using wall template supplied with heater, mark location for trim kit wall brackets. c) Attach brackets to wall (wall anchors, not provided may be required) and back of heater. Using screws provided on back of heater. d) Slide heater into position and secure brackets togehter. This should position back of heater 5” off wall. e) Select direction vent will exit trim kit, left, right, or straight up. f) Before installing trim kit remove knockout on this side. STEP 3 - INSTALL VENT a) Remove and discard P/N 72611 2”x24” black flex tubing from air inlet. (Save hose clamp). b) Attach P/N 72612 2”x6’ black flex tubing to air inlet. Secure with P/N 72593 2” hose clamp. c) Slide P/N 72575 2”x5’ flocked tube through trim kit opening (knockout) and attach to P/N 72610 orange silicone 90 elbow supplied with heater. Secure with 2” hose clamp. d) Attach P/N 41515 support brackets to wall. Wall anchors, not provided, may be required. Postion support brackets within 8” from side of trim kit and end of pipe. Secure flex tubing and flocked tube to brackets using 2” hose clamps. e) Attach P/N 41520 center bracket 2-1/2’ from pipe end and insert flex tube through bracket. This will prevent the flex tube from touching the black flocked exhaust tube. f) Connect flex air intake tube and flocked exhaust tube to collection box. g) Complete gas connection and attach trim kit to brackets. h) Follow lighting instructions. SPECIAL NOTES a) You may use up to three HEVK-5 Kits for a total of 15’ vent extension with two additional elbows. DO NOT EXTEND VENT BEYOND 15’ OR USE MORE THAN THREE TOTAL ELBOWS (one elbow is attached to heater outlet). b) To connect two vent kits together use P/N 72532 2”x3” steel coupling. Secure with 2” hose clamps. c) If you are using one, two, or three kits, after installation is complete you will discard 2 P/N 72593 hose clamps and one P/N 72532 steel coupling. d) If you need to make a 90 offset you will need to order P/N HEEL-1 90 Elbow Kit. Two offsets require two kits. e) If complete vent extension is horizontal, pipes may be sloped down slightly to allow any condensate to drain through the exhaust pipe to the outside. DO NOT ALLOW TO DRAIN ONTO WALKWAY. If any part of vent extension is vertical or local codes do not allow draining of condensate to outside you must add P/N HECK-1 Condensate Kit. f) For cosmetic purposes, the addition of the HEVK-5 Kit can be enclosed by adding a HEVE-5 Vent Encl...
Otros modelos de este manual:Eléctrico - HEDV403 (202.53 kb)