Iniciar sesión:
Votos - 5, Puntuación media: 3.8 ( )

Manual de usuario State Industries, modelo EHE

Fabricar: State Industries
Tamaño del archivo: 1.58 mb
Nombre del archivo: 1f00a2e1-4740-439a-bd6d-b30038af8629.pdf
Idioma del manual:en
Enlace gratuito para este manual disponible en la parte inferior de la página



Resumen del manual


Improper installation and/or operation will void the warranty. Installation and Operation Manual Hi-E2™ Model EHE Gas-Fired Pool and Spa Heater H0205000A WARNING If these instructions are not followed exactly, a fire or explosion may result, causing property damage, personal injury, or death. Do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance. WHAT TO DO IF YOU SMELL GAS • Do not try to light any appliance. • Do not touch any electrical switch; do not use any phone in your building. • Immediately call your gas supplier from a neighbor’s phone. Follow the gas supplier’s instructions. • If you cannot reach your gas supplier, call the fire department. Installation and service must be performed by a qualified installer, service agency or the gas supplier. TABLE OF CONTENTS SECTION 1 General Information 1A Introduction ........................................................... 1 1B Description ............................................................ 1 1C Warranty ................................................................ 1 SECTION 2 Installation Instructions 2A General Requirements .......................................... 1 2B Heater Assembly and Preparation ........................ 2 2C Heater Location ..................................................... 2 2D Installation Clearances .......................................... 2 2E Outdoor Installation ............................................... 2 2F Outdoor Shelter Installation (Canada) .................. 3 2G Indoor Installation.................................................. 3 2G-1 Preparation of Heater For Indoor Installation.................................................. 3 2G-2 Combustion Air Requirements for One-Pipe Installation ............................................. 4 2G-3 Two-Pipe Installation (Direct Vent) ....................... 4 2G-3a Connection of Combustion Air Pipe ...................... 4 2G-3b Piping Materials ..................................................... 4 2G-3c Size and Length of Combustion Air and Vent Piping ............................................... 5 2G-3d Combustion Air and Vent Pipe Installation ........... 5 2G-3e Room Ventilation ................................................... 7 2H Condensate Disposal ............................................ 7 2I Gas Supply and Piping ......................................... 8 2J Electric Wiring ..................................................... 10 2J-1 Electrical Power................................................... 10 2J-2 Bonding ............................................................... 10 2J-3 Auxiliary Time Clock Wiring ................................ 10 2J-4 Remote Operation ............................................... 10 2K Water Piping........................................................ 11 2K-1 Reversal of Heater Water Connections .............. 11 2K-2 Pool/Spa Piping Systems .................................... 11 2K-3 Connections at Heater......................................... 11 2K-4 Pressure Relief Valve .......................................... 12 2K-5 Automatic Chlorinators (Chemical Feeders)....... 12 2L Start-Up and Adjustment..................................... 13 2L-1 Normal Operation ................................................ 13 2L-2 Start-Up ............................................................... 14 2L-3 Condensate ......................................................... 14 2L-4 Gas Pressure....................................................... 14 2L-5 Adjustment of Water Pressure Switch ............... 14 2L-6 Water Temperature Rise ..................................... 15 SECTION 3 Operating Instructions 3A Start-Up Procedure ............................................. 16 3B Temperature Controls ......................................... 16 3C Lighting and Shutdown ....................................... 17 3C-1 Lighting the Heater .............................................. 17 3C-2 Shutdown............................................................. 17 3D Water Chemistry ................................................. 17 3D-1 Pools.................................................................... 17 3D-2 Spas .................................................................... 17 3D-2a Spa Water Chemistry .......................................... 17 3D-2b Water Changing .................................................. 17 3D-2c Corrosion ............................................................. 18 3D-2d Testing ................................................................. 18 3E Spa/Hot Tub Safety Rules................................... 18 3F Swimming Pool Energy Saving Tips ................... 18 3G Seasonal Care ..................................................... 19 3G-1 Spring and Fall Operation ................................... 19 3G-2 Winterizing .......................................................

Otros modelos de este manual:
Eléctrico - EHE (1.58 mb)

Comentarios



Tu reseña
Tu nombre:
Introduzca dos números de la imagen:
capcha





Categoría