|
Resumen del manual
" WC (1.57 kPa) (Hi) 10.0" WC ( .49 kPa) Table 5 Manifold (eleFuel # Manifold (eleFuel # Natural Gas .5" WC (.87 kPa) Propane 10.0" WC ( .49 kPa) Table 6 Test gauge connections are provided on the front of the millivolt gas control valve, identified IN for the inlet and OUT for the manifold side. A 1/8" NPT Test gauge connection is provided at the inlet and outlet side of the electronic gas control valve. These appliances must be isolated from the gas supply piping system (by closing their individual manual shut-off valve) during any pressure testing of the gas supply piping system at test pressures equal to or less than 1/2 psig (3.5 kPa). These appliances and their individual shut-off valves must be disconnected from the gas supply piping system during any pressure testing of that system at pressures greater than 1/2 psig (3.5 kPa). Orifice Sizes -Sea Level to High Altitude (All Models): These appliances are tested and approvedforinstallationsatelevationsof0-4500 feet (0-1372 meters) above sea level using the standard burner orifice sizes (marked with an "*" in Table 7 ). At the timeof installation, itmust bedetermined if the appliance needs to be derated. Contact yourlocalgassupplierforderationrequirements for your area. Deration -At higher elevations, the amount of BTU fuel value delivered must be reduced by eitherusinggasthathasbeenderatedbythegas company or by changing the burner orifice to a smallersizeas regulatedbythelocal authorities having jurisdiction and by the (USA) National Fuel Gas Code NFPA 54 / ANSI Z223.1 -latest edition or, in Canada, the CAN1-B149.1 and .2 codes -latest edition. Burner Orifice Sizes Elevation 0-4500 feet ( 0-1 7 meters) Model Nat.Gas Propane Series drill size (inches) drill size (inches) . mm (.090") * #54 (.055") * SSBV-3530 7L70 • 99K79 • # 6 (.1065") * #5 (.06 5")* SSBV-4035 18L40 • 7G00 • * Standard size installed at factory Table 7 • Part /Cat. Number Burn-in Period During the first few fires of this appliance there will be some odor due to the curing of paint and burning off of lubricants used in the manufacturing process. Depending on your use, the burn-in period may take a few hours or a few days. KEEP YOUR HOUSE WELL VENTILATED DURING THE CURING PROCESS. THE ODOR ANDHAZEEMITTEDBYTHECURINGPROCESS CANBEQUITENOTICEABLEANDMAYSETOFF A SMOKE DETECTOR. A white film may develop on the glass front during the first few fires as part of the curing process. The glass should be kept clean during thefirsttwoweeksofusetopreventthefilmfrom baking on (making it very difficult to remove). See Glass Cleaning on Page 5. Gas Controls / Control Compartment Access NOTE: The top louvered panel and the bottomlouvered control panel door remove and installthe same way as follows: Thegascontrolscanbefoundbehindthecontrol compartment access door. Removing Control Compartment Door: Openthedoorby gentlyliftintitupwarduntilthe hook catches on boths sides clear the locating slots. Then pull door out to remove. On millivolt systems, ...
Otros modelos de este manual:chimeneas - SSBV-3530CNE (4.4 mb)
chimeneas - SSBV-3530CNE (4.4 mb)
chimeneas - SSBV-3530CNM (4.4 mb)
chimeneas - SSBV-3530CNE (4.4 mb)