|
Resumen del manual
Tighten fittings using 2 wrenches. 6. When connecting regulator assembly to the tank valve, hand tighten black QCC1 nut clockwise to a positive stop. DO NOT use a wrench to tighten. Use of a wrench may damage the quick closing coupling nut and result in a hazardous condition. 7. Locate the hose out of pathways where people may trip over it or in areas where the hose may be subject to accidental damage. 8. Open tank valve fully (counter-clockwise). Turn the on/off valve at the unit slowly to the on position and use a soapy water solution to check all connections for leaks before attempting to light the appliance. If a leak is found, turn tank valve off and do not use the appliance until repairs can be made. W415-0638 / 04.24.08 ENCLOSURES FOR LP GAS SUPPLY SYSTEMS If you build an enclosure for an LP gas cylinder, follow these recommended specifications. You must also follow local codes. Enclosures for LP gas supply cylinders shall be ventilated by openings at the level of the cylinder valve and at floor level. The effectiveness of the opening(s) for purposes of ventilation shall be determined with the LP gas supply cylinder(s) in place. This shall be accomplished by one of the following: 1. One side of the enclosure shall be completely open; or 2. For an enclosure having four sides, a top and bottom: a) At least two ventilation openings at cylinder valve level shall be provided in the side wall, equally sized, spaced at 180 degrees (3.14 rad), and unobstructed. Each opening shall have a total free area of not less than . square inch per pound (3.2 sq. cm/kg) of stored fuel capacity and not less than a total free area of 10 square inches (64.5 sq. cm). b) Ventilation opening(s) shall be provided at floor level and shall have a total free area of not less than . inch per pound (3.2 sq. cm/kg) of stored fuel capacity and not less than a total free area of 10 square inches (64.5 sq. cm). If ventilation openings at floor level are in a side wall, there shall be at least two openings. The bottom of the openings shall be at floor level and the upper edge no more than 5 inches (127mm) above the floor. The openings shall be equally sized, spaced at 180 degrees (3.14 rad) and unobstructed. c) Every opening shall have minimum dimensions so as to permit the entrance of a 1/8 inch (3.2mm) diameter rod. 3. Cylinder valves shall be readily accessible for hand operation. A door on the enclosure to gain access to the cylinder valve is acceptable, provided it is non-locking and can be opened without the use of tools. 4. There shall be a minimum clearance of 2 inches (50.8mm) between the lower surface of the floor of the LP gas supply cylinder enclosure and the ground. 5. The design of the enclosure shall be such that (1) the LP gas supply cylinder(s) can be connected, disconnected and the connections inspected and tested outside the cylinder enclosure; and (2) those connections which could be disturbed when installing the cylinder(s) in the enclosure can be leak tested inside the enclosure. 6. Be certain to mount or set the LP gas cylinder on a flat surface and restrain it to prevent it from tipping. Purge the gas supply line of any trapped air prior to the first firing of the unit. WARNING: During the initial purging and subsequent lightings, NEVER allow gas valve to remain in the "Open" position without first placing and igniting the fi restarter. Natural Gas Supply Line (not supplied) Propane RegulatorHose Manual Gas Valve (on/off) QCC1 Tank Retaining Bracket TANK RETAINING BRACKET TANK RETAINING BRACKET 1. Fasten the bracket to the bottom of the propane bottle using bolt and nut supplied. (Fig. 1) 2. Tighten the lag screw into the mounting surface leaving approximately 1/4” of thread above the surface. 3. Slide propane bottle into position so that the bracket slides under the head of the lag screw. (Fig. 2) 4. Tighten the lag screw onto the bracket. 5. For fastening to a concrete surface a concrete anchor will #2 3. Place pocket on log #2 onto the locator on the base log. be required. (Not Supplied) Fig. 1 Fig. 2 #3 4. Hook log #3 into notch on base log. FINISHING LOG PLACEMENT / AGGREGATE BASE LOG 1. Set base log onto burner ensuring stud and bracket fit into hole and notch. Base log should sit flat on "Patioflame" base. #1 2. Place "Y" end of log #1 into "Y" notch on the base log. #4 5. Place log #4 into notch on base and pocket on log #3. AGGREGATE 6. Patioflame is supplied with 3lbs of lava rock. All 3lbs can be poured into outer ring. It may be mixed, or layered with desired aggregate on top. DO NOT PLACE AGGREGATE ONTO BURNER. W415-0638 / 04.24.08 OPERATION OPERATION Upon completing the gas line connection, a small amount of air will be in the lines. When first lighting the burner, it will take a few seconds for the lines to purge themselves of this air. Once the purging is complete, the burner will light and operate as indicated in the instruction manual. Subsequent lighting of the appliance will not require such p...
Otros modelos de este manual:chimeneas - Patioflame GPFN (589.96 kb)