Iniciar sesión:
Votos - 3, Puntuación media: 3.3 ( )

Manual de usuario Hearth and Home Technologies, modelo 8000CFLP-OAKIPI

Fabricar: Hearth and Home Technologies
Tamaño del archivo: 3.46 mb
Nombre del archivo: ae4d7af4-0211-4276-8c72-dacc2ef317e4.pdf
Idioma del manual:en
Enlace gratuito para este manual disponible en la parte inferior de la página



Resumen del manual


Vaulted Ceiling Installation • Remove one shield from box. NOTICE: Cut previously installed batt insulation to make room for the attic insulation shield. • Cut the attic insulation shield (if application is for vaulted ceiling) to fit your ceiling pitch. Snip cut edge to recreate 1 in. bend tabs all the way around the bottom. • Wrap shield around pipe if pipe is already installed in area to be insulated. • Match the three holes in each side and fasten with three screws to form a tube. • Bend three tabs on the bottom of the shield outward to allow attachment to the ceiling firestop. • Bend the remaining bottom tabs inward 90. to maintain the air space between the pipe and the shield. Set the shield on the ceiling firestop and attach to the firestop. • Bend all tabs inward 90. around the top of the shield. These tabs must be used to prevent blown insulation from getting between the shield and vent pipe, and to maintain air space clearance. Figure 8.9 Attic Insulation Shield BEND ALL TABS INWARD 90° TO MAINTAIN CLEARANCE AND PREVENT INSULATION FROM FALLING INSIDE INSERT 3 SCREWS BEND 3 TABS OUTWARD TO FASTEN TO CEILING FIRESTOP-BEND REMAINING TABS INWARD 90 DEGREES TO MAINTAIN CLEARANCE Heat & Glo • 8000CF-OAK-IPI • 2059-900 Rev. Q • 11/08 32 Heat & Glo • 8000CF-OAK-IPI • 2059-900 Rev. Q • 11/08 A. Attaching Sheetrock Ledges Attach sheetrock ledges together using the attachment holes (see Figure 9.1). Figure 9.1 The sheetrock ledges will attach to the top of the unit (see Figure 9.2). Figure 9.2 Attach previous assembly to the top of the unit using the provided slots. The face of the sheetrock ledge assembly and the unit surround should be fl ush to each other. Figure 9.3 SEE DETAIL B CLEARANCE SLOT SHEETROCK LEDGE UNIT SURROUND ATTACHMENT HOLES 6 PLACES DETAIL B B. Temporary Access Panel Remove the lower access panel to run the electrical and gas lines to the unit (see Figure 9.3). Once the electrical and gas lines are hooked up, the lower access panel must be put back on the unit. LOWER ACCESS PANEL SEE DETAIL A DETAIL A ATTACHMENT HOLES NAILING TAB 9 Appliance Preparation Heat & Glo • 8000CF-OAK-IPI • 2059-900 Rev. Q • 11/08 33 C. Securing and Leveling the Appliance WARNING! Risk of Fire! Prevent contact with: • Sagging or loose insulation • Insulation backing or plastic • Framing and other combustible materials Block openings into the chase to prevent entry of blownin insulation. Make sure insulation and other materials are secured. DO NOT notch the framing around the appliance standoffs. Failure to maintain air space clearance may cause overheating and fi re. The diagram shows how to properly position and secure the appliance (see Figure 9.4). Nailing tabs are provided to secure the appliance to the framing members. • Bend out nailing tabs on each side. • Place the appliance into position. • Keep nailing tabs fl ush with the framing. • Level the appliance from side to side and front to back. • Shim the appliance as necessary. It is acceptable to use wood shims underneath the appliance. • Secure the appliance to the framing by using nails or screws through the nailing tabs. • Secure the appliance to the fl oor by inserting two screws through the pilot holes at the bottom of the appliance. Figure 9.4 Proper Positioning and Securing of an Appliance D. Installing the Fiberglass Gasket The fi berglass gasket supplied in the manual bag seals between the fi rst 8 inch (203 mm) vent component and the outer fi replace wrap. Using 2 self-tapping screws from the manual bag secure the gasket to the outer wrap (see Figure 9.5). Figure 9.5 Fiberglass Gasket FIRST VENT COMPONENT FIBERGLASS GASKET OUTERWRAP NAILING TABS (BOTH SIDES) 34 Heat & Glo • 8000CF-OAK-IPI • 2059-900 Rev. Q • 11/08 PILOT PLATE Figure 9.8 Note: Ensure pilot plate is in place. This will ensure pilot stability (see Figure 9.8) F. Checking Pilot Plate Figure 9.7 Re-install grate in unit RE-INSTALL INTO THE UNIT E. Completing Grate Set-up 1. Straighten the tabs on the grate bracket (see Figure 7.10) and remove grate from unit. 2. Remove grate bracket (see Figure 9.6) by bending it back and forth until it breaks. Discard grate bracket. 3. Remove 4 tabs holding base refractory (see Figure 7.10) by bending tabs back and forth until they break. 4. Reinstall grate into unit (see Figure 9.7). Figure 9.6 Removing Grate REMOVE GRATE REMOVE GRATE BRACKET REMOVE TAB HOLDING DOWN BASE REFRACTORY (4 PLACES) STRAIGHTEN TO REMOVE GRATE 110 Installing Vent Pipe A. Assemble Vent Sections Attach Vent to the Firebox Assembly Note: The end of the pipe sections with the lanced tabs will face toward the appliance. Attach the first pipe section to the starting collar: • Lanced pipe end to the starting collar • Inner pipe over inner collar • Push the pipe section until all lanced tabs snap in place • Lightly tug on pipe to confirm it has locked. Commercial, Multi-family (Multi-level exceeding two stories), or High-Rise Applications All outer pipe joints must be sealed with h...

Otros modelos de este manual:
chimeneas - 8000CF-OAK-IPI (3.46 mb)

Comentarios



Tu reseña
Tu nombre:
Introduzca dos números de la imagen:
capcha





Categoría