Iniciar sesión:
Votos - 3, Puntuación media: 3.7 ( )

Manual de usuario Monessen Hearth, modelo UVFRC-4228

Fabricar: Monessen Hearth
Tamaño del archivo: 1.06 mb
Nombre del archivo: Lennox_Hearth_UVFRC_UVF_Installation_700032M.pdf
Idioma del manual:en
Enlace gratuito para este manual disponible en la parte inferior de la página



Resumen del manual


Be sure firebox rests on a solid continuous floor or platform with appropriate framing for support and so that no cold air can enter room from under the fi rebox. CAUTION Do not block the heat-circulating air inlets and outlets on these fireboxes. Doing so may create a potential fi re hazard. The firebox may be positioned and then the framing built around it, or the framing may be constructed and the firebox positioned into the opening. Usually, no special floor support is needed for the fi rebox, however, to be certain: 1. Estimate the total weight of the firebox system and surround materials such as marble, brick, stone, etc., to be installed (see Product Referance Table on Page 10 for appliance weight). 2. Measure the square footage of the floor space to be occupied by the system and surrounds. 3. Note the floor construction, i.e. 2" x 6", 2" x 8" or 2" x 10", single or double joists, type and thickness of fl oor boards. 4. Use this information and consult your local building code to determine if you need additional support. If you plan to raise the fi rebox, build the platform assembly then position firebox on top. Secure the platform to the floor to prevent possible shifting. Firebox Installation Step 1. Frame these appliances as illustrated in Figures 9 through 11. All framing details must allow for a minimum clearance to combustible framing members as shown in Figures 2 through 6. Also refer to appliance specifi cations on Page 10 . Headers may be in direct contact with the appliance top spacers but must not be supported by them or notched to fit around them. All construction above the appliance must be self supporting, DO NOT USE THE APPLIANCE FOR STRUCTURAL SUPPORT. Note: The framed depth from a framed wall, must always be measured from a finished surface. If a wall covering such as drywall is to be attached to the rear wall, then the depth must be measured from the drywall surface. It is important that this dimension be exact. Step 2. Level the firebox by checking the top edge of the fi rebox. Shim if necessary. Step 3. Fireplace should be secured to side framing members using the full length nailing tabs at the top and bottom of the fireplace front face. Use 8d nails (see Figure 7). NOTE: DIAGRAMS & ILLUSTRATION ARE NOT TO SCALE. Note: The nailing flange and the area directly behind the nailing flange is exempt from the clearances described on the fi rebox clearance label. Step 4. To safely operate the heater with consideration of the mantel clearances the canopy must be installed (Model UVF-36 Only). IMPORTANT Under no circumstances shall the firebox top spacers be removed or modified (see Figure 8). The header may be in direct contact with the top spacers but must not be supported by them or notched to fi t around them. Top Spacer 8d Nail Figure 7 10 NOTE: DIAGRAMS & ILLUSTRATION ARE NOT TO SCALE. Figure 8 SPECIFICATIONS Gas Line Access - Both Sides Access Opening for Junction Box - Right Side Only (remove the knock-out before instal...

Otros modelos de este manual:
Los aficionados - UVFRC-3628 (1.06 mb)
Los aficionados - UVFRC-3628 (1.06 mb)
chimeneas - UVFRC-3628-H (1.06 mb)
chimeneas - UVF-36 (1.06 mb)

Comentarios



Tu reseña
Tu nombre:
Introduzca dos números de la imagen:
capcha





Categoría