Iniciar sesión:
Votos - 5, Puntuación media: 3.8 ( )

Manual de usuario Carrier, modelo 09DK054-084

Fabricar: Carrier
Tamaño del archivo: 1.74 mb
Nombre del archivo: 09dk-4si.pdf
Idioma del manual:en
Enlace gratuito para este manual disponible en la parte inferior de la página



Resumen del manual


i / ■ / I I FCPS3 | \ i \ i FCPS2- —o U !t il It 32% 36% tlj FCPS1 32% FCPS2 FCPS4 FCPS3 Î •! 32% t ! 18% r-O NOTES: 1 FCPS1 = Fan cycle pressure switch 1 response to condensing pressure. 2. FCPS2 = Fan cycle pressure switch 2 response to condensing pressure 3. FCPS3 = Fan cycle pressure switch 3 n__ response to condensing pressure. u f-1 4. FCPS4 = Fan cycle pressure switch 4 response to condensing pressure 5 In the above applications where a fan is being shared by two different refrigeration circuits, the FCPSs (FCPS1 and 3 or FCPS2 and 4) are in parallel so that if either circuit needs the fan to be on, it will be on cycles fan 3 in cycles fan 4 in cycles fan 3 in cycles fan 4 in FCPS1 18% 32% FCPS — Fan Cycle Pressure Switch Fig. 8 — Typical Field Piping Arrangements (cont) 13 084 Units .....O FCPS2- TA..... FCPS1 100% O- -9—I li FCPS1 iî il 50% / 50% o I I n FCPS1 FCPS4 33% it il 67% --o FCPS2 FCPS4 FCPS3 rO 33% î '1 17% o- -i ¡1 17% 33% FCPS — Fan Cycle Pressure Switch 1 FCPS1 = = Fan cycle pressure switch 1 cycles fan 3 in response to condensing pressure. 2 FCPS2 = = Fan cycle pressure switch 2 cycles fan 4 in response to condensing pressure 3. FCPS3 = = Fan cycle pressure switch 3 cycles fan 3 in response to condensing pressure. 4. FCPS4 = = Fan cycle pressure switch 4 cycles fan 4 in response to condensing pressure 5. In the above applications where a fan is being shared by two different refrigeration circuits, the FCPSs (FCPS1 and 3 or FCPS2 and 4) are in parallel so that if either circuit needs the fan to be on, it will be on. FCPS1 Fig. 8 — Typical Field Piping Arrangements (cont) 14 LEFTSIDE COILS RIGHT SIDE COILS 054,064 PERCENT CAPACITY SPLIT LINE TYPE COIL CONNECTION NUMBER COIL CONNECTION in.-ODM* TUBING CONNECTION in. ODMf 100 Hot Gas Liquid 1.3.5.7 2.4.6.8 1 1/8 7/8 1 5/8 1 1/8 50/50 Hot Gas Liquid 1,3/5,7 2,4/6,8 1 1/8 7/8 1 3/8 7/8 1 3/8 7/8 66/34 Hot Gas Liquid 1,3,5/7 2,4,6/8 1 1/8 7/8 1 3/8 7/8 1 1/8 7/8 34/34/32 Hot Gas Liquid 1/7/3,5 2/8/4,6 1 1/8 7/8 (3) 1 1/8 (3) 7/8 34/34/16/16 Hot Gas Liquid 1 /7/3/5 2/8/4/e 1 1/8 7/8 — ‘Connection sizes reflect size of each coil header nozzle. fA tubing package Is factory supplied to facilitate field piping installation for the 100, 50/50 and 66/34 capacity split applications See installation instructions for more information 074 PERCENT CAPACITY SPLIT LINE TYPE COIL CONNECTION NUMBER COIL CONNECTION in.-ODM* TUBING CONNECTION in.-ODMf 100 Hot Gas Liquid 1.3.5.7 2.4.6.8 1 3/8 7/8 2 1/8 1 1/8 50/50 Hot Gas Liquid 1,3/5,7 2,4/6,8 1 3/8 7/8 1 5/8 7/8 1 5/8 7/8 68/32 Hot Gas Liquid 1,3,5/7 2,4,6/8 1 3/8 7/8 1 5/8 7/8 1 3/8 7/8 32/32/36 Hot Gas Liquid 1/7/3,5 2/8/4,6 1 3/8 7/8 (3) 1 3/8 (3) 7/8 32/32/18/18 Hot Gas Liquid 1 /7/3/5 2/B/4/6 1 3/8 7/8 — 'Connection sizes reflect size of each coil header nozzle tA tubing package is factory supplied to facilitate field piping installation for the 100, 50/50 and 68/32 capacity split applications. See Installation instructions for more information. 084 PERCENT CAPACITY SPLIT LINE TYPE COIL CONNECTION NUMBER COIL CONNECTION in.-ODM* TUBING CONNECTION in.-ODMf Hot Gas 1,3,5,7 1 3/8 2 1/8 Liquid 2,4,6,8 7/8 1 1/8 Hot Gas 1,3/5,7 1 3/8 1 5/8 1 5/8 dU/dU Liquid 2,4/6,8 7/8 7/8 7/8 Hot Gas 1,3,5/7 1 3/8 1 5/8 1 3/8 Liquid 2,4,6/8 7/8 1 1/8 7/8 Hot Gas 1/7/3,5 1 3/8 (3) 1 3/8 Liquid 2/8/4,6 7/8 (3) 7/8 33/33/17/17 Hot Gas Liquid 1/7/3/5 2/B/4/6 1 3/8 7/8 'Connection sizes reflect size of each coil header nozzle tA tubing package is factory supplied to facilitate field piping installation for the 100, 50/50 and 67/33 capacity split applications See installation Instructions for more Information. Fig. 9 — Coil Connection Data 15 100% Coil Circuiting Applications: 084 Units 1. Piping — Refer to Fig. 9 and 21 for field piping details for 100% coil circuiting. Note that tubes 16 and 20 require a cut on the longer leg of the tubes. Two 7/8-in. OD tubes, approximately 3 in. (72.6 mm) long, must be cut from the remaining tubes (22 or 23) and brazed between the tees (item 9) and coil header stubs. The remaining tubes are not used in this application and may be discarded. 2. Install Fan Cycle Pressure Switches and Clamps — Braze 2 valve core bodies to designated hole locations on tubes 20 and 24. Insert valve cores into valve core bodies by threading into place and tightening to 1 5 to 3 in.-lb (169.5 to 339 mN-m) Install FCPS1 and FCPS2 at designated locations on tubes 20 and 24. Cut the 3/8-in. field-supplied FCPS conduit at a desired length to fit between each FCPS location and the junction box on the unit. See Fig. 11 for typical conduit installation. Feed FCPS wires through each conduit and secure at the switch by utilizing each conduit connector. See Fig. 13. Secure the conduit at the junction box with 3/8-in. field-supplied conduit connectors. Wire FCPS1 and F...


Comentarios



Tu reseña
Tu nombre:
Introduzca dos números de la imagen:
capcha





Categoría