Installation Connecting the KVM Switch or Server Step 1 Make sure your KVM switch or server is powered OFF. Step 2 Using the included PS/2 KVM Cable Kit, connect one set of VGA and PS/2 connectors to the back of the Console. (Refer to diagrams below.) Step 3 Connect the other end of the Cable Kit to the console monitor, keyboard, and mouse ports on your KVM switch or server. (Refer to diagrams below.) Step 4 Power ON the Console. Step 5 Power ON the KVM switch or server connected to the Console.
IEC Power Cable VGA, PS/2 Cable Kit Bracket Kit 15", 17", or 19" LCD Rack Console Bracket Screws Quick Installation Guide Keys Introduction This booklet will guide you through the basic steps needed to install the 15", 17", or 19"LCD Rack Console. IEC Power Cable VGA, PS/2 Cable Kit Bracket Kit 15", 17", or 19" LCD Rack Console Bracket Screws Quick Installation Guide Keys Introduction Specifications Material Heavy-duty steel Power Auto-switching 100 to 240VAC 50 to 60Hz 48 watts Net Weight 29.0
IEC Power Cable VGA, PS/2 Cable Kit Bracket Kit 15", 17", or 19" LCD Rack Console Bracket Screws Quick Installation Guide Keys Introduction Specifications Material Heavy-duty steel Power Auto-switching 100 to 240VAC 50 to 60Hz 48 watts Net Weight 29.0 lbs. (13.2kg.) [F1DC100P-SR] 31.0 lbs. (14.1kg.) [F1DC101P-SR] 34.7 lbs. (15.7kg.) [F1DC102P-SR] Unit Dimensions 19 (W) x 21.7 (D) x 1.70 (H) in. (482.6 x 551.2 x 43.18mm) [F1DC100P-SR and F1DC101P-SR] 19 (W) x 23.6 (D) x 1.70 (H) in. (482.6 x 599.
Step 2: Mount the front brackets to the rack. Step 3: Connect the rear brackets to the Console with the provided screws. Step 4: Adjust the length of the rack-mount brackets. Installation Step 5: Lock the adjustable brackets by tightening the rear screws. Step 6: Connect the IEC power cable to an active power outlet and power up the Console. ...... Installation Connecting the KVM Switch or Server Step 1 Make sure your KVM switch or server is powered OFF. Step 2 Using the included PS/2 KVM Cable
On-Screen Display (OSD) The OSD allows you to switch servers, assign names to your servers, start and stop the AutoScan feature, set the desired scan-time interval for AutoScan, enable the password security feature, and program hot keys. To access the OSD menu, press “Scroll Lock”, “Scroll Lock”, and the space bar. Immediately, the OSD screen will appear. The superimposed menu screen is generated by the LCD Rack Console, and does not affect the function of your server, operating system, or softw
Overview.......................................................................................3 Feature Overview..........................................................................3 Equipment Requirements...............................................................4 System Requirements....................................................................6 Unit Display Diagrams...................................................................7 Specifications...............................
Example of Daisy-Chain Configuration Getting Started: Step 1: Make sure that all servers, LCD Rack Console, and PRO3 KVM Switches are powered off and that each PRO3 KVM Switch has been assigned a unique BANK address. Step 2: Place all primary and secondary KVM switches in the desired location. cable 1cable 2cable 3Primary unit (BANK 00) Secondary unit (BANK 01) Secondary unit (BANK 02) Secondary unit (BANK 03) Connecting the Primary and Secondary KVM Switches: Step 1 Using the Daisy-Chain Cable