Manual de usuario Manitowoc Ice, modelo Q-0320

Fabricar: Manitowoc Ice
Tamaño del archivo: 119.93 kb
Nombre del archivo: 8005503.pdf
Idioma del manual:en
Enlace gratuito para este manual disponible en la parte inferior de la página



Resumen del manual


Preparation 1. Disconnect power from ice machine. 2. Remove front, top, and side panels. 3. Drain water from sump trough. 4. Ice machine must be thoroughly dried before the insulation can be installed. Use towels to dry bulkhead and base assembly. Base Insulation Installation 1. Raise the ice machine above the bin. A high lift can be used, or (two people required) lift front edge of ice machine and place wood blocks (2”x 4”) between ice machine and bin. Lifting one side of ice machine at a time, move wood blocks to center balance point of ice machine. 2. Slide vacuum-formed base insulation assembly between the ice machine and bin. Align the insulation with the back and sides of the bin and ice machine. 3. Add one layer of foam tape insulation from the front of the bin to the front of the base insulation on the left and right side. 4. Raise front of ice machine and position the wood blocks on edge (3 1/2” height). This will allow the top of the vacuum- formed base to be accessed. 2. Install vacuum-formed base insulation and align back and sides. 3. Add foam tape both sides. Manitowoc Ice, Inc. 2110 South 26 Street, P.O. Box 1720, Manitowoc, WI 54221-1720 USA 8005503 Telephone 920-682-0161, Fax - Sales: 920-683-7589, Service/Parts: 920-683-7585, Other: 920-683-7879 Sheet 1 of 3 Web Site - 06/22/00 5. Place two beads of black silicone sealant (1” in from the edge) on the front and both sides of the vacuum-formed base. 6. Remove wood blocks and lower the ice machine onto the vacuum-formed base (check side and back alignment). Push the center of the vacuum-formed base tight to the ice machine base. Secure the vacuum-formed base to the ice machine water trough with tape. Remove tape after silicone sealant has set. 7. Seal the front edge of the base insulation to the bin with white silicone sealant. Install Mylar Strip between Evaporator and Bulkhead Mylar will cover the joint where the bulkhead attaches to the base. It will extend from the left sidewall past the water inlet fitting. 1. Remove screws (right and left side) that secure the evaporator to the bulkhead. 2. Determine bin switch wire location and cut a slot in the top edge of the mylar strip (adhesive edge = top). 3. Apply silicone sealant at the bin switch wire entrance and the left side corner (4” each direction) where the base and bulkhead meet. 4. Pull evaporator away from bulkhead. Place bottom of mylar strip in sump trough and slip up behind evaporator (align slot cut in step 3 with bin switch wire). Mylar must extend above bottom evaporator mounting screw (approximately 2” above gasket/bulkhead joint). 5. Remove paper backing from mylar. Apply tension to mylar to eliminate wrinkles. 6. Align evaporator extrusion and bulkhead screw holes; puncture mylar for the bottom screw holes and insert screws. Install all remaining evaporator screws. 7. Puncture mylar and insert screws removed in step 2. Bulkhead and Sidewall Insulation 1. Using the supplied insulation as a template, cut and remove the fiberglass insulation (approximately 9” from base to top of cut). Using a putty knife, scrape insulation and glue from the bottom of the ...

Otros modelos de este manual:
Equipos de Bombeo - Q-0420 (119.93 kb)

Comentarios



Tu reseña
Tu nombre:
Introduzca dos números de la imagen:
capcha





Categoría