Iniciar sesión:
Votos - , Puntuación media: ( )

Manual de usuario Manitowoc Ice, modelo G-0600

Fabricar: Manitowoc Ice
Tamaño del archivo: 121.07 kb
Nombre del archivo: 8006183.pdf

Idioma del manual:en

El documento se está cargando, por favor, espere
El documento se está cargando, por favor, espere

Resumen del manual


START AND RUN COMPONENT CHANGES VARY WITH THE TYPE OF MACHINE. FOR J-SERIES MACHINES ONLY, THE RUN CAPACITOR NEEDS TO BE REPLACED WITH THE ONE INCLUDED IN THE KIT. B AND G-SERIES MACHINES NEED ALL OF THE START AND RUN COMPONENTS REPLACED WITH THE ONES INCLUDED IN THE KIT. 1. 2. 3. 4. Disconnect power to the ice machine at the electrical disconnect (moving the toggle switch to the off position will not disconnect line voltage). Remove panels (top, front, left and right sides). Recover refrigerant from ice machine. Remove right side corner post (when facing the front of the machine) and back panel. 5. Remove wiring from compressor terminals. 6. Unsweat suction line at compressor port. Unsweat discharge and process lines at the T fitting and swage joint (or after “T” fitting, if remote) respectively. NOTE: IF REPLACING COMPRESSOR IN A REMOTE ICE MACHINE, BE SURE TO UNSWEAT THE CONNECTION BETWEEN THE HPR VALVE AND THE PROCESS TUBING AT THE “T” FITTING. Swage Joint “T” Fitting 7. Remove compressor from machine. Make sure to crimp and braze shut ports to compressor. 8. Insert new compressor into the machine, as shown. Manitowoc Ice, Inc. 2110 South 26 Street, P.O. Box 1720, Manitowoc, WI 54221-1720 USA 8006183 Telephone 920-682-0161, Fax - Sales: 920-683-7589, Service/Parts: 920-683-7585, Other: 920-683-7879 Sheet 1 of 3 Web Site - 06/25/01 9. Fit tubing provided into the proper place, as shown. Cut ice machine suction line to fit new tubing. Deburr suction line before fitting new tubing in. 11. Braze all tubing into place. Purge system with nitrogen during all brazing operations on the ice machine. NOTE: IF REPLACING COMPRESSOR INTO A REMOTE ICE MACHINE, MAKE SURE TO FIRST FOLLOW INSTRUCTIONS A, B, AND C BELOW, BEFORE PROCEEDING TO INSTRUCTION #10. A. Replace elbow with “T” fitting. 12. Use electrical tape to seal suction line insulation. B. Replace HPR valve and L-shaped tube that was removed earlier. Adjust to fit without rubbing against any other parts of the machine. 13. Reattach the wiring harness to the compressor. 14. Replace the filter/dryer before evacuating the machine. Make sure that the filter/dryer tubing is not rubbing against the compressor. 15. Evacuate machine to 500 microns. C. Return to instruction #10. 10. Place armaflex insulation provided in kit on suction line, as shown in picture below. Slide insulation up 8006183 tubing and secure while brazing. Sheet 2 of 3 06/25/01 16. Charge the machine with the nameplate charge. 17. Make sure that all the tubing is not rubbing against anything else in the machine. 18. Reinstall the corner post that was removed earlier and place electrical cover on compressor. 19. Reinstall back panels of ice machine. 20. Make sure to replace start and run components according to the machine you are replacing the compressor in. See note in the beginning of instructions for designation. 21. Reinstall all other panels. 22. Reconnect power and test ...

Otros modelos de este manual:
Equipos de Bombeo - J-0600 (121.07 kb)

Comentarios



Tu reseña
Tu nombre:
Introduzca dos números de la imagen:
capcha





Categoría