|
Resumen del manual
ZC Kit – Large Pellet Insert (99200149) Minimum Enclosure Dimensions Min. Max. Recommended Height* 29” 31” ** 30” Width 36” 43” ** 40” Depth*** 18” 22” **** 20” * The enclosure height must be raised the same amount as the floor protection (e.g. if you are using 1” floor protection, the min. height is 30” above the sub-floor). ** The maximum height is determined by the surround panel size (the surround panels are 32” tall). *** When determining depth, include the facing material (drywall, tile, etc.) – see the illustration below. **** When venting vertically, there is no maximum depth. Width Depth* Height When determining the position of the insert, consider the position of the framing behind the insert relative to the vent - see the illustration below. * When determining the depth, include the facing material (drywall, tile, etc.). : The enclosure may be raised. The minimum distance from the base of the enclosure to the ceiling is 72” Ceiling 7.5” . AAA Pellet vent requires 3” clearance to combustibles. A TOP VIEW Page 4 of 8 10/9/06 © Travis Industries, Inc. ZC Kit – Large Pellet Insert (99200149) Minimum Floor Protection • The insert must be placed on a non-combustible floor protector (cement board, sheet metal, etc.) a minimum .018” thick (26 gauge). This floor protection must extend the full width and depth of the enclosure and must protrude 6” in front of the door opening (18” from the enclosure opening) and the full width of the surround panels (45” min. width). • HEARTH NOTE: If you wish to install a hearth greater than 1/2” thick, you will need to raise the insert and enclosure height the equivalent amount. The leveling bolts may be used on the insert for adjustments. AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA 45” Min. (width of surround panels) 18” Min. Floor Protection AAAAAAAAAAAAAAAAAAAAAAAAAAAA Enclosure Height (measure from top of floor protection) AAAAAAAAAAAAAAA Floor Protection 12” Minimum Place the stove on top of the floor protection and measure the center of the flue. This will determine the location of the wall thimble. Page 5 of 8 10/9/06 © Travis Industries, Inc. ZC Kit – Large Pellet Insert (99200149) ZC Can Construction Construct the zc can as shown below. WARNING: The sheet metal edges are sharp. Use gloves when handling the zc can. Top of ZC Can Knock-out for top vent applications A Use the included screws to secure the zc can sides and top to the zc can rear panel. Rear Vent Shield (not required for top-vent applications) AAAAAAAAAAAAAAAAA A knock-out is provided on the rear panel for rear vent applications. Bend the mounting flange as shown. AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA Bend the top stand-off as shown and secure it to the zc can with the included screws. Page 6 of 8 10/9/06 © Travis Industries, Inc. ZC Kit – Large Pellet Insert (99200149) ZC Can Placement • Place the zc can inside the enclosure. The zc can must be placed so the front edge of the mounting flanges are flush with the enclosure opening. Secure the enclosure to the floor protection (and sub-floor) with screws. • When venting horizontally the rear vent shield must be installed over the top of the zc can. When installed, the rear vent shield should contact the thimble (it acts as a heat shield above the vent. When in place these tabs must be flush with the enclosure opening. AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA 2-1/2” Min. (both sides) Secure the zc can to the floor protection (and sub floor) with screws. For rear vent appliations, slide the rear vent shield all the way back until it contacts the wall thimble. Page 7 of 8 10/9/06 © Travis Industries, Inc. ZC Kit – Large Pellet Insert (99200149) Insert Preparation and Placement • Place the extending hopper into its highest position (see the manual for details). This increases the pellet capacity of the heater. • Install the surround panels onto the insert and slide it into place. The surround panels must maintain a 3/8” gap from the enclosure opening (the stand-offs on the surround panels provide the 3/8” spacing). • After the insert is in place, attach the vent starter section to the insert (it is attached with a latch – make sure the gasket is correctly positioned). • The leveling bolts may be used to level the insert. • We reco...
Otros modelos de este manual:Placa - 99200149 (164.08 kb)