Iniciar sesión:
Votos - 2, Puntuación media: 4 ( )

Manual de usuario Grindmaster, modelo P400ESHP

Fabricar: Grindmaster
Tamaño del archivo: 2.12 mb
Nombre del archivo: adf0732b-f0d3-4364-59f4-a0a502774256.pdf
Idioma del manual:en
Enlace gratuito para este manual disponible en la parte inferior de la página



Resumen del manual


4 Adjustments ........................................................ 5-8 Care and Cleaning ............................................... 9-10 Service ............................................................... 10-11 Troubleshooting Filling Problems ....................................... 12 Heating Problems ................................. 13 Brewing Problems ................................ 14 Parts Illustrations Models P300E & P400E ....................... 15 Model P400ESHP .....................................16 Model RAP400E ..................................... 17 Model RAPS400E ................................... 18 VSB-400................................................ 19 Shuttle CS-LL .......................................... 20 Rough-In Drawings Model P300........................................................... 21 Model P400 & P400ESHP ...................... 22 Model RAP300 ......................................... 23 Model RAP400 ........................................ 24 Model RAPS300 ....................................... 25 Model RAPS400 ..................................... 26 VSB-300 .................................................. 27 VSB-400 ................................................ 28 Wiring Diagrams P300E/P400E with 1 Batch Timer ......... 29 P300E/P400E with 2 Batch Timer........ 30 RAP300E/RAP400E................................31 RAPS300E/RAPS400E........................32 P400ESHP ...........................................33 Drawing #091-548 .................................34 Drawing #091-182 .....................................35 WARNING . ELECTRIC SHOCK HAZARD! Installation of this appliance should be performed by qualified service per son nel only. Improper installation could result in elec tro cu tion. See rough-in drawings in this manual for di men sions and lo ca tions of electric and water input. Set-Up/Position 1) Remove the brewer from the packing material and attach its legs. 2) Position the brewer on a strong, stable table or counter. Check the level front to back and side to side. Adjust the legs to the cor rect level. IMPORTANT: THE PERSON INSTALLING THIS APPLIANCE IS RESPONSIBLE FOR ENSURING THAT ELECTRIC AND WATER CONNECTIONS MEET THE RE QUIRE MENTS OF THE NATIONAL ELECTRIC CODE, NATIONAL PLUMBING CODE, AND ANY LOCAL ORDINANCES. The electric and water hook-up locations are behind the front pan el. Re move the four screws fastening this panel for access to these con nec tions. Water Hook-up 1) The water line may enter through holes on the rear or the bottom of the brewer. Use the right hand opening for water. 2) Use 3/8" copper or flexible water line to prevent strain. Do not use low temperature plastic tubing. The connection to the fill valve is 3/8" flare. 3) Water line pressure must be from 30 to 70 psi. 4) Hot (up to 160°F) or cold water may be used. Hot water offers faster recovery between brews. 5) Install a shut-off valve near the brewer. 6) Installing a filtering system can improve the taste of brewed coffee and extend the life of the brewer. If your water has high calcium (lime), chlorine, or iron content, this is especially important. The filter should be the lime inhibiting type if cold water is used. Contact your local water treatment professional regarding the type of filter you should use based on water quality and volume of water used. Prior authorization must be obtained from Grindmaster Corporation for all warranty claims. Grindmaster Corporation 4003 Collins Lane Louisville, KY 40245 USA (502) 425-4776 (800) 695-4500 (USA & Canada only) (800) 568-5715 (Technical Service Only) FAX (502) 425-4664 © Grindmaster Corporation, 1998 0307 FORM # AM-309-08 PRINTED IN U.S.A. Part # 090-077 Installation (con't) Electric Hook-up 1) The electric ratings for your brewer are printed on its nameplate. Typical electric ratings are: P300, P400, RAP300, RAP400 Optional 120/208V, 3.8kW, 18A or 120/240V 5.0kW, 21A, 1 phase Standard 120/208V, 5.0kW, 24A or 120/240V 6.6kW, 28A, 1 phase RAPS300, RAPS400 Standard 120/208V, 4.4KW, 21A or 120/240V, 5.6KW 24A, 1 phase P400ESHP Standard 440V, 12.5KW, 16.3A, 3 phase WYE If the brewer includes the three heater tank option C21A, the ratings will be different. Always see the nameplate for correct ratings. 2) The brewer should be connected to its own circuit with a fused disconnect switch or a circuit breaker near the brewer. 3) Attach the appropriately sized cord to the brewer with a cord grip for the 1 1/2" electric input opening. The cord may enter through the rear or bottom on the left side of the brewer. Use an oil resistant cord such as type SO, SOO, SAO, STOO, SEO, SJO, SJOO, SJTO, SJTOO, SJEO, HSO, HSOO, HSJO, or HSJOO. Alternatively, flexible conduit and type THHN wires may be used. Use only copper conductors. 4) Standard connection is 1 phase 3 wire. Connect the two lines to L1 and L2 on the terminal block. If the brewer is wired for three phase, a lug, L3, is provided on the term...


Comentarios



Tu reseña
Tu nombre:
Introduzca dos números de la imagen:
capcha





Categoría