Iniciar sesión:
Votos - 2, Puntuación media: 3.5 ( )

Manual de usuario Bradley Smoker, modelo EXPRESS CRS-3/IR

Fabricar: Bradley Smoker
Tamaño del archivo: 400.31 kb
Nombre del archivo:
Idioma del manual:en
Enlace gratuito para este manual disponible en la parte inferior de la página



Resumen del manual


4. OPTIONAL TRAP COVER: Install the 1/4" wall anchor for the Trap Cover (supplied by installer) as shown on Figure 1. Use Trap Cover to locate. 5. OPTIONAL SOAP TANK: Install 1/4" anchors for soap tank installation (refer to soap system installation manual #215-1583 for further instructions). Step 4: Remove cover from bowl assembly 1. Unpack the bowl and cover assembly. 2. Remove the wing nuts on the two threaded rods which retain the cover (see Figure 3). 3. Remove the top cover bracket. 4. Lift the cover off and set aside. Step 5: Mount the bowl to the wall WARNING: Do not attempt to install the bowl by yourself. To prevent seriousinjury, install the bowl with the assistance of another person andalways use appropriate lifting procedures. 1. With someone to assist you, move the bowl assembly to the wall using appropriate lifting procedures, secure the bowl to the wall. 2. Level the bowl assembly with shims if necessary and then tighten anchors. TOP COVER THREADED ROD 330-078 WING NUT TOP COVER BRACKET (140-852) (161-076) Figure 3 Bradley Corporation • 215-1330 Rev. K; EN 06-915 2/8/07 Installation Instructions continued . . . Step 6: Install drain spud 1. Assemble the P-trap by (supplied by installer) connecting the 1-1/2" tubular pipe to the 1-1/4" tailpiece and to the 1-1/2" drain pipe stubbed out of the wall (see Figure 4). Step 7: Connecting Supply 1. Connect the 1/2" NPT female end of the stop/check valves to the rough-ins. 2. Connect one end of the supply hoses to the stop/check valves. IMPORTANT: The hose attached to the hot water inlet of the Vernatherm™ TMV valve must be connected to the hot water rough-in. 3. Connect the other end of the supply hoses to the Vernatherm™ TMV valve assembly. 4. OPTIONAL SINGLE-TEMPERED SUPPLY: Attach the stop/check valve to the 1/2" tempered supply line. Connect the stop/check valve to the solenoid valve with the flexible supply hose. NOTE: The thermostatic mixing valve requires at least 115° F water from the hot water side for proper operation. As with all lavatories, there will be a delay in obtaining warm water. If the hot water is too far away from the washfountain, a circulating pump may be required. Express® Crescent® Lavatory System - CRS-Series CRS-2/IR, CRS-3/IR Installation Instructions 6 2/8/07 Bradley Corporation • 215-1330 Rev. K; EN 06-915 Figure 4 STRAINER AND TAILPIECE 269-1584 DRAIN ASSEMBLY 1/4" RUBBER WASHER P-TRAP (polypropylene) 269-1697 FIBER WASHER NUT TRIM TO FIT Figure 5 VALVE MOUNTING BRACKET FLEXIBLE SUPPLY HOSE HOT SUPPLY COLD SUPPLY STOP/CHECK VALVE VERNATHERM™ MIXING VALVE HOT SUPPLY INLET VERNATHERM™ MIXING VALVE COLD SUPPLY INLET Express® Crescent® Lavatory System - CRS-Series Installation Instructions CRS-2/IR, CRS-3/IR Bradley Corporation • 215-1330 Rev. K; EN 06-915 2/8/07 7 Installation Instructions continued . . . Step 8: Electrical and supply connections NOTE: Refer to Figure 6a below for CRS-2/IR or Figure 6b on page 8 for CRS-3/IR. WARNING: The Adaptive® Infrared control must be connected with a 24 VAC Class II transformer. Connections to 110 VAC will result in damage to the electronics and can cause personal injury. CAUTION: Connection of leads other than shown may cause permanent damage to the sensor. NOTE: Compliance and conformity to local codes and ordinance is the responsibility of the installer. NOTE: The solenoid valves have been pre-wired. 1. Snap the senser circuit plug from the bowl into the solenoid circuit plug located on the valve bracket. 2. Snap the transformer circuit plug into the female transformer circuit plug located on the valve bracket. 3. Turn on the water supply to the Express® Crescent® Lavatory System and check for leaks. 4. Plug in the transformer and wait at least two minutes to allow the sensor to adapt to the environment. 5. Pass your hand in front of each station’s sensor until all the air is purged from the lines and water is flowing smoothly. NOTE: The Vernatherm mixing valve is NOT factory preset. Upon installation, the temperature of this valve must be checked and adjusted to ensure delivery of a safe water temperature. Water in excess of 110°F (43°C) may cause scalding. GREEN SUPPLY TUBE (FROM SPRAYHEAD) RED SUPPLY TUBE (FROM SPRAYHEAD) RED SPADE TERMINAL GREEN SPADE TERMINAL SENSOR CIRCUIT PLUG COMPRESSION NUT (110-231) TRANSFORMER CIRCUIT PLUG WHITE SPADE TERMINAL Figure 6a Installation Instructions continued . . . Step 8: Electrical and supply connections, cont’d. 6. Check the temperature when approximately 1.0 GPM water flow is reached and adjust if necessary (the range of the valve is 95°F–115°F (35°C–43°C). To adjust the temperature, follow the procedure below: • Loosen temperature locking nut with wrench. • Using a blade screwdriver, turn the adjustment stem counterclockwise to increase the temperature or clockwise to decrease the temperature (see Figure 7). • Once desired temperature is reached, tighten nut to prevent temperature change. Express® Crescent® Lavatory System - CRS-Seri...

Otros modelos de este manual:
Fontanería - EXPRESS CRS-2/IR (400.31 kb)

Comentarios



Tu reseña
Tu nombre:
Introduzca dos números de la imagen:
capcha





Categoría