|
Manual de usuario Alliance Laundry Systems, modelo 802715
Fabricar: Alliance Laundry Systems Tamaño del archivo: 1.31 mb Nombre del archivo: 954dccee-8ebf-4403-a435-d3b08f9cf95c.pdf
Idioma del manual:
|
|
|
|
Enlace gratuito para este manual disponible en la parte inferior de la página
Resumen del manual
Refer to Figure 6. NOTE: End of drain hose must be below 24 in. (61 cm). Laundry Tub Installation: For this type of installation, the drain hose MUST be secured to the stationary tub to prevent hose from dislodging during use. Refer to Figure 7. Use the beaded strap (supplied in accessories bag) to secure hose. H023I 1 Drain Hose 2 Beaded Strap (tape if necessary) 3 Fill Hoses Figure 6 3 1 2 SWD600N 1 Drain Hose 2 Tie-Down Strap (tape if necessary) Figure 7 SWD600N 1 2 Step 4: (Gas Dryer Only) Connect Gas Supply Pipe WARNING To reduce the risk of gas leaks, fire or explosion: • The dryer must be connected to the type of gas as shown on nameplate located in the door recess. • Use a new flexible stainless steel connector. • Use pipe joint compound insoluble in L.P. (Liquified Petroleum) Gas, or Teflon tape, on all pipe threads. • Purge air and sediment from gas supply line before connecting it to the dryer. Before tightening the connection, purge remaining air from gas line to dryer until odor of gas is detected. This step is required to prevent gas valve contamination. • Do not use an open flame to check for gas leaks. Use a non-corrosive leak detection fluid. • Any disassembly requiring the use of tools must be performed by a suitably qualified service person. W316 1. Make certain your dryer is equipped for use with the type of gas in your laundry room. Dryer is equipped at the factory for Natural Gas with a 3/8 inch NPT gas connection. NOTE: The gas service to a gas dryer must conform with the local codes and ordinances, or in the absence of local codes and ordinances, with the latest edition of the National Fuel Gas Code ANSI Z223.1/NFPA 54 or the CAN/CGA-B149, National Gas Installation Code. Natural Gas, 1000 Btu/ft3 (37.3 MJ/m3) service must be supplied at 6.5 ± 1.5 inch water column pressure. For proper operation at altitudes above 3000 feet (915 m) the natural gas valve spud orifice size must be reduced to ensure complete combustion. Refer to Table 1. Natural Gas Altitude Adjustments Altitude Orifice Size Part No. feet m No. inches mm 3000 915 43 0.0890 2.26 503778 6000 1830 44 0.0860 2.18 58719 8000 2440 45 0.0820 2.08 503779 9000 2740 46 0.0810 2.06 503780 10,000 3050 47 0.0785 1.99 503781 Table 1 2. Remove the shipping cap from the gas connection at the rear of the dryer. Make sure you do not damage the pipe threads when removing the cap. 3. Connect to gas supply pipe. NOTE: When connecting to a gas line, an equipment shut-off valve must be installed within 6 feet (1.8 m) of the dryer. An 1/8 in. NPT pipe plug must be installed as shown for checking inlet pressure. Refer to Figure 8. D434I 1 New stainless steel flexible connector - (Use design CSA certified connector) Use only if allowed by local codes 2 1/8 in. NPT Pipe Plug 3 Equipment Shut-Off Valve 4 Black Iron Pipe Shorter than 20 ft. (6.1 m) - Use 3/8 in. (9.5 mm) pipe 5 3/8 in. NPT Gas Connection Figure 8 1 3 2 4 5 4. Tighten all connections securely. Turn on gas and check all pipe connections (internal & external) for gas leaks with a non-corrosive leak detection fluid. 802715 © Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT 9 NOTE: The dryer and its appliance main gas valve Grounding Information must be disconnected from the gas supply piping system during any pressure testing of that system at test pressures in excess of 1/2 psi (3.45 kPa). Refer to Step 12 (Check Heat Source). L.P. (Liquefied Petroleum) Gas, 2500 Btu/ft3 (93.1 MJ/m3) service must be supplied at 10 ± 1.5 inch water column pressure. For proper operation at altitudes above 3000 feet (915 m) the L.P. gas valve spud orifice size must be reduced to ensure complete combustion. Refer to Table 2. L.P. Altitude Adjustments Altitude Orifice Size Part No. feet m No. inches mm 3000 915 55 0.0520 1.32 58755 8000 2440 56 0.0465 1.18 503786 Table 2 NOTE: DO NOT connect the dryer to L.P. Gas Service without converting the gas valve. Install L.P. Gas Conversion Kit 649P3, available at extra cost. Step 5: (Electric Dryer Only) Connect Electrical Plug Dryer requires 120/240 Volt or 120/208 Volt, 60 Hertz, 3 or 4 wire electrical suppy. Refer to serial plate for specific electrical requirements. NOTE: The wiring diagram is located behind the control panel, inside the control cabinet. • This dryer must be connected to a grounded metal, permanent wiring system; or an equipment-grounding conductor must be run with the circuit conductors and connected to the equipment-grounding terminal or lead on the dryer. • The dryer has its own terminal block that must be connected to a separate branch, 60 Hertz, single phase circuit, AC (alternating current) circuit, fused at 30 Amperes (the circuit must be fused on both sides of the line). Electrical service for the dryer should be of maximum rated voltage listed on the nameplate. Do not connect dryer to 110, 115, or 120 volt circuit. • Heating elements are available for field installation in dryers which are to be connected to electrical...
|