Iniciar sesión:
Votos - 2, Puntuación media: 4.5 ( )

Manual de usuario ParaBody, modelo 375101

Fabricar: ParaBody
Tamaño del archivo: 1.14 mb
Nombre del archivo: 0d075e9a-aeb8-43f7-bfc9-5d6fdd4d9445.pdf
Idioma del manual:en
Enlace gratuito para este manual disponible en la parte inferior de la página



Resumen del manual


17 8 20 35 11 FIGURE 11 STEP 11 STEP 12 • Slide the PRESS ARM ADJUST (7) over the bearings in the TOP BOOM (5) as shown in FIGURE 11. (NOTE: Steps 12 & 13 may require two people to assemble.) FIGURE 12 5 7 5 62 • Insert two 3/4" FLANGE BEARINGS (62) into bushings on the TOP BOOM (5) as shown in FIGURE 11. 0 1 2 3 4 5 6 1/2 1/2 1/2 1/2 1/2 1/2 12 FIGURE 13 FIGURE 14 STEP 14 • Snap two WEIGHT PLATE BUSHINGS (28) each, into the top side of fifteen WEIGHT PLATES (31) as shown in FIGURE 13. STEP 13 31 28 3. SECURELY tighten two 5/16” SET SCREWS (57) to the collars on the end of the PRESS ARM (3) as shown in FIGURE 13. • Slide one 3/4 DIA X 11" SHAFT (25) through PRESS ARM (3), PRESS ARM ADJUST (7), and TOP BOOM (5) as shown in FIGURE 13. 4. SECURELY assemble one 1/2” SPRING PIN ASSEMBLY (37) into the SPRING PIN BARREL on the PRESS ARM (3). Pull back on spring pin until it engages with one of the slots in the PRESS ARM ADJUST (7). 5 37 1/2” SPRING PIN 7 3 25 57 63 3/8 X 1-1/4” 51 2. Assemble two 3/8 X 1-1/4” BOLTS (63) and two 3/8” WASHERS (51) to the 3/4” DIA X 11” SHAFT (25) as shown in FIGURE 12.(NOTE: SIMULTANEOUSLY tighten bolts, then back nut off 1/4 turn to allow the PRESS ARM (3) to rotate freely.) • Slide the PRESS ARM (3) over the PRESS ARM ADJUST (7) as shown in FIGURE 13. Use the following sequence to tighten the PRESS ARM: 1. Center PRESS ARM (3) and PRESS ARM ADJUST (7) over the BENCH FRAME (2) and have someone firmly hold in place until sequence 3 is completed.. 2 5. If further adjustment is necessary, loosen the bolts securing the TOP BOOM (5) to the BASE (1) and BENCH FRAME (2), reposition TOP BOOM accordingly and retighten. IMPORTANT! Follow sequence below. FIGURE 15 13 FIGURE 16 STEP 15 • Insert two GUIDE RODS (19) into the BASE (1) as shown on FIGURE 15. (NOTE: Lubricate GUIDE RODS (19) with silicon or teflon spray available at most hardware stores.) • Slide two 1-1/4 X 4-7/8” TUBES (18), two 3/4” WASHERS (56), and two WEIGHT STACK CUSHIONS (29) - IN THAT ORDER - down over the GUIDE RODS (19). • Securely assemble the WEIGHT STACK SHAFT (27) to the HEAD PLATE (26) using one 3/8 X 1- 1/4” BOLT (63) and one 3/8” LOCK WASHER (52). • Using EXTREME CARE slide all fifteen WEIGHT PLATES (31) down over the GUIDE RODS (19) on to the WEIGHT STACK CUSHIONS (29). Make sure that the keyholes of the WEIGHT PLATES (31) are all facing the right way. • Insert two CAP PLUGS (45) into the top ends of the GUIDE RODS (19). • Slide the head plate assembly down over the GUIDE RODS (19) onto the weight stack. • Attach the WEIGHT STACK LABELS (71) to the weight stack. Also insert the WEIGHT STACK PIN (30) into the first WEIGHT PLATE (31) of the weight stack. 18 3/8 X 1-1/4” 63 56 45 3/8” LOCK WASHER 52 27 31 30 19 29 26 1 STEP 16 71 • SECURELY assemble one 3-1/2” PULLEY (34) to the FLOATING PULLEY BRACKET (11) using one 3/8 X 2” BOLT (64), two 3/8” WASHER (51), and one 3/8” LOCKNUT (50) as shown in FIGURE 16. 64 3/8 X 2” 50 46 11 34 • Assemble one 2” SQ. RUBBER BUMPER (46) to the FLOATING PULLEY BRACKET (11) as shown in FIGURE 16. 51 14 FIGURE 17 STEP 17 • Slide the GUIDE ROD SUPPORT (6) onto GUIDE RODS (19) and swing the assembly up to the TOP BOOM (5). FIGURE 18 STEP 18 3/8 X 3” 66 5 50 60 54 1/2” LOW HEIGHT 55 6 51 60 58 33 67 1/2 X 3” 3/8 X 2-3/4” 65 • SECURELY assemble one 3-1/2” PULLEY (34) to the front slot in the TOP BOOM (5) using one 3/8 X 2-3/4” BOLT (65), two 3/8” FLANGE SPACERS (60), and one 3/8” LOCKNUT (50) as shown in FIGURE 17. • Route the threaded end of PRIMARY CABLE (33) through the TOP BOOM (5) as shown in FIGURE 17. 34 • SECURELY assemble one 3-1/2” PULLEY (34) to the rear slot in the TOP BOOM (5) and the GUIDE ROD SUPPORT (6) using one 3/8 X 3” BOLT (66), two 3/8” WASHERS (51), one 1/4” SPACER (58), two 3/8” FLANGE SPACERS (60), and one 3/8” LOCKNUT (50) as shown in FIGURE 17. • SECURELY assemble the GUIDE ROD SUPPORT (6) to the TOP BOOM (5) using one 1/2 X 3” BOLT (67), two 1/2” WASHER (55), and one 1/2” LOW HEIGHT LOCK NUT (54) as shown in FIGURE 17. • Route the PRIMARY CABLE (33) around the pulley in the FLOATING PULLEY BRACKET (11) as shown in FIGURE 18. • SECURELY assemble two 3-1/2” PULLEYS (34) to the GUIDE ROD SUPPORT (6) using two 3/8 X 2-3/4” BOLTS (65), four 3/8” FLANGE SPACERS (60) and two 3/8” LOCK NUTS (50). See FIGURE 18. 34 11 60 50 60 6 33 3/8 X 2-3/4” 65 51 15 0 1 2 3 4 5 6 1/2 1/2 1/2 1/2 1/2 1/2 STEP 19 FIGURE 19 • Screw the threaded end of the PRIMARY CABLE (33) into the end of the WEIGHT STACK SHAFT (27) until the FLOATING PULLEY BRACKET (11) firmly contacts the GUIDE ROD SUPPORT (6) and the CABLE (33) slightly pulls on the HEAD PLATE (26). Tighten the jam nut securely. See FIGURE 19. 27 26 33 FIGURE 20 STEP 20 • SECURELY assemble two 3-1/2” PULLEYS (34) to the SWIVEL PULLEY BRACKET (13) using two 3/8 X 2” BOLTS (64), four 3/8” WASHERS (51) and two 3/8” LOCK NUTS (50) as shown in FIGURE 20. • Route the metal ball end of the SECONDARY CABLE (32) through the SWIVEL PULLEY BRAC...


Comentarios



Tu reseña
Tu nombre:
Introduzca dos números de la imagen:
capcha





Categoría