Iniciar sesión:
Votos - 3, Puntuación media: 4.3 ( )

Manual de usuario Air King, modelo EI30WC60GS

Fabricar: Air King
Tamaño del archivo: 1.67 mb
Nombre del archivo: 27b12048-9ed6-e254-35a6-28e7ffb6bd59.pdf
Idioma del manual:en
Enlace gratuito para este manual disponible en la parte inferior de la página



Resumen del manual


• Locate the template packed with the literature. • The height installation is determined by the following image. Mark the location. • Installation height: 30" gas cooktop/range or 24" to 30" electric cooktop/range. • Use a level to draw a horizontal straight pencil line on the wall, which is your desired installationheight. • Find the centerline of the cooktop. Use a level to draw a vertical straight pencil line on the wall. CHECK TO BE SURE THE LINE IS PERFECTL CHECK TO BE SURE THE LINE IS PERFECTLCHECK TO BE SURE THE LINE IS PERFECTLCHECK TO BE SURE THE LINE IS PERFECTLCHECK TO BE SURE THE LINE IS PERFECTLCHECK TO BE SURE THE LINE IS PERFECTLY YYYYY PERPERNDICULAR. PERPERNDICULAR.PERPERNDICULAR.PERPERNDICULAR.PERPERNDICULAR.PERPERNDICULAR. 99999Installing the hood Mounting the duct cover bracketMounting the duct cover bracketMounting the duct cover bracketMounting the duct cover bracketMounting the duct cover bracket The duct bracket should be installed against the back wall and flush with the ceiling. This bracket will hold the telescopic duct cover in place at the top (this a extra accessory available not included with the hood). . SecurSecurSecurSecurSecure the bracket to the wall:e the bracket to the wall:e the bracket to the wall:e the bracket to the wall:e the bracket to the wall: • Align the marked centerline on the bracket with the centerline on the wall. • Mark 2 screw hole locations in the wall. • Drill 5/16" pilot holes in the marked locations. • Install wall fastener anchors. • Drive wood screws, by hand, into the fastener to allow anchors to expand. Remove the screws. • Secure the bracket to the wall with wood screws and/or fasteners. Ceiling ductingCeiling ductingCeiling ductingCeiling ductingCeiling ducting If the duct will vent straight up to the ceiling: • Use level to draw a line straight up, from the centerline on the template to the ceiling. • Measure at least 4 -12/16 ” from the back wall to the circle center of an 8-.” hole on the ceiling. WWWWWall ductingall ductingall ductingall ductingall ducting If ductwork will vent to rear: • Use a level to draw a line straight up from the centerline on the template. • Measure at least 23 - 12/16" (the measure might vary depending on the elbow used) above the pencil line that indicates the bottom installation height, to the circle center of an 8-.” diameter duct hole (Hole may be elongated for duct elbow). House wiring locationHouse wiring locationHouse wiring locationHouse wiring locationHouse wiring location • The junction box is located on the top left side of the hood. • Wiring should enter the back wall at least 20" above the bottom of the installation height, and within 5-7/8" and 4-7/8"of the left side of the centerline. !"!#$ % #& '(&!#$)*""% #&'(& +, -. +- 99999Installing the hood Mounting the duct cover bracketMounting the duct cover bracketMounting the duct cover bracketMounting the duct cover bracketMounting the duct cover bracket The duct bracket should be installed against the back wall and flush with the ceiling. This bracket will hold the telescopic duct cover in place at the top (this a extra accessory available not included with the hood). . SecurSecurSecurSecurSecure the bracket to the wall:e the bracket to the wall:e the bracket to the wall:e the bracket to the wall:e the bracket to the wall: • Align the marked centerline on the bracket with the centerline on the wall. • Mark 2 screw hole locations in the wall. • Drill 5/16" pilot holes in the marked locations. • Install wall fastener anchors. • Drive wood screws, by hand, into the fastener to allow anchors to expand. Remove the screws. • Secure the bracket to the wall with wood screws and/or fasteners. Ceiling ductingCeiling ductingCeiling ductingCeiling ductingCeiling ducting If the duct will vent straight up to the ceiling: • Use level to draw a line straight up, from the centerline on the template to the ceiling. • Measure at least 4 -12/16 ” from the back wall to the circle center of an 8-.” hole on the ceiling. WWWWWall ductingall ductingall ductingall ductingall ducting If ductwork will vent to rear: • Use a level to draw a line straight up from the centerline on the template. • Measure at least 23 - 12/16" (the measure might vary depending on the elbow used) above the pencil line that indicates the bottom installation height, to the circle center of an 8-.” diameter duct hole (Hole may be elongated for duct elbow). House wiring locationHouse wiring locationHouse wiring locationHouse wiring locationHouse wiring location • The junction box is located on the top left ...

Otros modelos de este manual:
Los aficionados - EI30WC60GS (1.67 mb)
Los aficionados - EI30WC60GS (1.67 mb)
Los aficionados - EI30WC60GS (1.67 mb)
Los aficionados - EI30WC60GS (1.67 mb)

Comentarios



Tu reseña
Tu nombre:
Introduzca dos números de la imagen:
capcha





Categoría