Iniciar sesión:
Votos - 2, Puntuación media: 3.5 ( )

Manual de usuario Baxi Potterton, modelo ECOGEN 24/1.0

Fabricar: Baxi Potterton
Tamaño del archivo: 3.76 mb
Nombre del archivo: ddc14df6-23d5-4b33-ae46-0d5df33c102c.pdf
Idioma del manual:en
Enlace gratuito para este manual disponible en la parte inferior de la página



Resumen del manual


Error codes that are shown as automatic reset will disappear once the fault has cleared. The appliance will restart if there is a demand except in the case of errors 263 and 264 when the appliance must be switched off and on again to enable a restart. All other error codes indicate a fault condition, which will require the attention of a service engineer. © Baxi Heating UK Ltd 2010 12.0 Care of the Boiler Warning ! If you smell gas Do not operate light switches Do not operate any electrical equipment Do not use a telephone in the hazardous area Extinguish any naked flame and do not smoke Open windows and doors in the hazardous area Turn off the gas supply at the meter Warn any other occupants and vacate the premises Telephone the National Gas Emergency Service on:0800 111 999 Faulty boiler If it is known or suspected that a fault exists on the boiler, it must not be used until the fault has been corrected by a competent person. Test Nipple Off Position View from under appliance Gas Service Cock On Position 12.1 Cleaning the Outer case The painted panels should be wiped with a damp cloth and then dried completely. DO NOT USE ABRASIVE CLEANING AGENTS. 12.2 Maintenance The appliance MUST be serviced annually by a Baxi authorised engineer. 12.3 Condensate drain The condensate drain, located at the bottom of the appliance, must not be modified or blocked. Blockage will cause the appliance to shut down. 12.4 Protection & Precaution 1. The appliance incorporates frost protection for itself only, fitted as standard. If the system has a Programmable Room Unit mounted in a cradle on a wall then the central heating system will also be protected. 2. In cold weather, if you are going away, turn the appliance off at the time switch ONLY. Leave the mains supply switched ON. 3. If a system frost thermostat has been fitted (your installer will be able to advise you), then to operate correctly and protect your system, the gas and electricity must be left on and the appliance set in the central heating mode. 4. The boiler incorporates an integral pump protection feature which continually monitors the time since the pump last operated. To prevent seizure, the pump will operate for approximately 1 minute if it has not run in the last 24 hours. 12.5 Fault Indication 1. If a fault occurs on the boiler an error code may be shown on the facia display. 12.6 In an Emergency If a gas leak occurs or is suspected, the boiler can be isolated at the inlet valves as follows; 1. Using a suitable open ended spanner, turn the square nut on the gas tap through 90° (1/4 turn) in a clockwise direction to isolate the gas supply at the boiler. 2. Call your Installer or Service Engineer as soon as possible. 20 © Baxi Heating UK Ltd 2010 13.0 Legislation 13.1 Installation, Commissioning, Service & Repair 1. This appliance must be installed in accordance with the manufacturer’s instructions and the regulations in force. Read the instructions fully before installing or using the appliance. 2. In GB, this must be carried out by a competent person as stated in the Gas Safety (Installation & Use) Regulations. 3. Definition of competence: A person who works for a Gas Safe registered company and holding current certificates in the relevant ACS modules, is deemed competent. 4. IN IE (Eire), this must be carried out by a competent person as stated in I.S. 813 “Domestic Gas Installations”. All Gas Safe registered engineers carry an ID card with their licence number and a photograph. You can check your engineer is registered by telephoning 0800 408 5500 or online at The boiler meets the requirements of Statutory Instrument “The Boiler (Efficiency) Regulations 1993 No 3083” and is deemed to meet the requirements of Directive 92/42/EEC on the energy efficiency requirements for new hot water boilers fired with liquid or gaseous fuels: Type test for purpose of Regulation 5 certified by: Notified Body 0087. Product/Production certified by: Notified Bodies 0086. For GB/IE only. 13.2 Benchmark Commissioning Checklist 1. Please ensure that the installer has fully completed the Benchmark Checklist on the inside back pages of the installation instructions supplied with the product and that you have signed it to say that you have received a full and clear explanation of its operation. The installer is legally required to complete a commissioning checklist as a means of complying with the appropriate Building Regulations (England and Wales). 2. All installations must be notified to Local Area Building Control either directly or through a Competent Persons Scheme. A Building Regulations Compliance Certificate will then be issued to the customer who should, on receipt, write the Notification Number on the Benchmark Checklist. 3. This product should be serviced regularly to optimise its safety, efficiency and performance. The service engineer should complete the relevant Service Record on the Benchmark Checklist after each service. 4. The Benchmark ...


Comentarios



Tu reseña
Tu nombre:
Introduzca dos números de la imagen:
capcha





Categoría