Iniciar sesión:
Clasificado: Nombre ↑   Descargas   Tarifa   Tamaño ↑  
Descargado: 1   Tamaño del archivo: 461 kb   Fabricar: Energy Tech Laboratories  
Categoría: Calentadores de Agua
@name

Example: For an energy consumption of 21,500 MJ per year and a natural gas tariff of 2.1 cents per MJ ($0.021/MJ), the lifetime running cost is: 21,500 x $0.021 x 12 = $5,418 The labels can also be used to estimate the lifetime greenhouse gas emissions. For each MJ of gas consumed, around 0.06 kg of carbon dioxide is emitted, so for the example above the greenhouse gas emissions are: 21,500 x 0.06 x 12 = 15,480 kg or 15.48 tonnes The actual running costs and greenhouse gas emissions will depend

Descargado: 4   Tamaño del archivo: 3 mb   Fabricar: Energy Tech Laboratories  
Categoría: Calentadores de Agua
@name

C. CLEANTHE FIREBOX. 1. Usingwireorfibrebristlebrush,cleancrown of boiler and inside of water legs. DO NOT allow brush to strike target wall or blanket in the combustion chamber. D. AFTER CLEANING, remove protective cloth with debrisand vacuum as necessary, but becareful not to damage blanket. Inspect target wall, combustion chamber blanket and burner mounting plate insulation for signs ofdamage. If damaged, replaceas needed. E. REASSEMBLE BOILER. CAUTION: Do not startthe burnerunless canopy, sm

Descargado: 2   Tamaño del archivo: 3 mb   Fabricar: Energy Tech Laboratories  
Categoría: Calentadores de Agua
@name

Refer to Table 9 for proper nozzle size, air settings and fuel pump pressure setting based on desired firing rate. If the desired firing rate is the lower GPH: a. replace the factory installed high firing rate nozzle with one of the loose lower firing rate nozzles. b. replace the factory installed head positioning bar with the corresponding head bar that matches the lower GPH nozzle installed, see Table 9. c. change the factory air settings according to Table 9 and, d. check the oil pump pressur

Descargado: 23   Tamaño del archivo: 3 mb   Fabricar: Energy Tech Laboratories  
Categoría: Calentadores de Agua
@name

has determined that the CL3-091, CL3-105, CL4-126 and CL5-168 water boilers meet the ENERGY STAR® guidelines for Energy efficiency established by the United States Environmental Protection Agency (EPA). For service or repairs to boiler, call your heating contractor. When seeking information on boiler, provide Boiler Model Number and Serial Number as shown on Rating Label. Boiler Model Number CL Boiler Serial Number Installation Date Heating Contractor Phone Number Address 100825-01R5-10/08 Price

Descargado: 3   Tamaño del archivo: 3 mb   Fabricar: Energy Tech Laboratories  
Categoría: Calentadores de Agua
@name

i. Assure that all system radiators, piping and vents are absolutely leak tight. • When a steam boiler is installed in an existing system, ALL air vents should be replaced at the same time. This assures that the new boiler will not be compromised by existing system leaks. • If the system contains hidden supply or return piping (hidden behind walls, buried in concrete, etc.) pressure test this piping to assure there are no leaks. ii. Repair any leaks in the system. iii. Install accurate water met





Categoría