Iniciar sesión:
Votos - 4, Puntuación media: 4.5 ( )

Manual de usuario Arrow Storage Products, modelo 697.68222

Fabricar: Arrow Storage Products
Tamaño del archivo: 4.1 mb
Nombre del archivo: 6e97b273-78ee-4d00-97a5-6b3c29581f72.pdf
Idioma del manual:en
Enlace gratuito para este manual disponible en la parte inferior de la página



Resumen del manual


CARE MUST BE TAKEN WHEN HANDLING THEVARIOUS PIECES 715500109 TO AVOI D A MISHAP. FOR SAFETY SAKE, PLEASE READ SAFETY INFORMATION PROVIDED IN THIS MANUAL BEFORE BEGiNNiNG CONSTRUCTION.WEAR GLOVES BUiLDiNG DiMENSiONS * Size rounded offtothe nearest foot o WHENHANDLINGMETALPARTS. Exterior Dimensions interior Dimensions Door •Approx. Foundation Storage Area (Roof Edge to Roof Edge) (Wail to Wail) Opening Size Size Sq. Ft. Cu. Ft. Width Depth Height Width Depth Height Width Heigh 10'x12' 121"x1431/4" 115 759 1231/4" 1453/4" 877/8" 1181/4" 1401/2" 865/8" 551/2" 60" 3,0m x 3,6m 307,3cm x 363,9cm 10,7m2 21,5m3 313,1cm 370,2cm 223,2cm 300,4cm 356,9cm 220,0cm 141,0cm 152,4crr BEFORE YOU BEGIN.... A2 Owner's Manual Before beginning construction, check local building codes regarding footings, location and other requirements. Study and understand this owner's manual. Important information and helpful tips will make your construction easier and more enjoyable. Assembly Instructions: Instructions are supplied in this manual and contain all appropriate information for your building model. Review all instructions before you begin, and during assembly, follow the step sequence carefully for correct results. Foundation and Anchoring: Your storage building must be anchored to prevent wind damage. A foundation is also necessary as a base in order to construct a square and level building. Anchoring and foundation materials are not included with your building. We recommend the combined use of an Arrow Floor Frame Kit and an Arrow Anchoring Kit as an effective method of securing your building to the ground (Available by mail order or at your local dealer) or you may construct a foundation and anchoring system of your choice. Your assembly instructions provide information on a few methods commonly used to secure and level a storage building. Parts and Parts List: Check to be sure that you have all the necessary parts for your building. ,All part numbers can be found on the parts. All of these numbers (before the -) must agree with the numbers on the parts list. The parts list is located on page 12. ,if you find that a part is missing, include the model number of your building and contact: Arrow Group Industries, Inc. Customer Service Department Route 50 East Breese, Illinois 62230 1-800-851-1085 ,Separate contents of the carton by the part number while reviewing parts list. The first few steps show how to join related parts to make larger sub assemblies which will be used later. ,Familiarize yourself with the hardware and fasteners for easier use during construction. These are packaged within the carton. Note that extra fasteners have been supplied for your convenience. PLAN AHEAD.... A3 Watch the Weather: Be sure the day you select to install your building is dry and calm. Do not attempt to assemble your building on a windy day. Be careful on wet or muddy ground. Teamwork: Whenever possible, two or more people should work together to assemble your building. One person can position parts or panels while the other is able to handle the fasteners and the tools. Tools and Materials: These are some basic tools and materials you will need for the construction of your building. Decide which method of anchoring and the type of foundation you wish to use in order to form a complete list of the materials you will need. Required Required Eye Goggles Work Gloves No. 2 Phillips Screwdriver Step Ladder Optional Time-Savers Foundation Preparation (With Hardened Magnetic Tip) Utility Knife / Scissors Wrench / Nut Driver Hammer and Nails Note: A power screwdriver or variable speed drill with Phillips-tip attachment can speed assembly by as much as 40%. Pliers Carpenter's Level • Tape Measure Electric / Cordless Drill Square String (for squaring frame) Spade or Shovel Hand Saw/Power Saw Lumber and/or Concrete Selecting and Preparing Your Site: Before assembly, you will want to decide on a location for your building. The best location is a level area with good drainage. oAIIow enough working space for ease of moving parts into position during assembly. Be sure there will be enough space at entrance for doors to open fully and enough space around the building to be able to fasten the panel screws from the outside. oBefore you begin the first steps in assembling your parts, a foundation should be constructed and an anchoring system should be ready to use. SAFETY FIRST.... A4 Safety precautions are important to follow ,,Care must be taken when handling various pieces of your building since some contain sharp edges. Please wear work gloves, eye protection and long sleeves when assembling or performing any maintenance on your building. safety_ L safetyedge ,,Keep children and pets away from worksite to avoid distractions and any accidents which may occur. "Never concentrate your total weight on the roof of the building. When using a step ladder make sure that it is fully open and on even ground before climbing on it. throughout the construction of your b...


Comentarios



Tu reseña
Tu nombre:
Introduzca dos números de la imagen:
capcha





Categoría