Iniciar sesión:
Clasificado: Nombre ↑   Descargas   Tarifa   Tamaño ↑  
Descargado: 101   Tamaño del archivo: 2 mb   Fabricar: Apollo  
Categoría: La puerta automática
@name

Use mounting hardware capable of supporting the weight of the control box with the battery installed. Mounting holes are not provided since mounting surfaces will vary. STEP 4 Connecting the Actuator (s) Set battery inside of control box with terminals toward the front (Do not use any battery with side terminals). Connect actuator cable to the “MASTER” connector on the control board. If a 1600 is being installed and conduit is being used under the drive (recommended), cut the slave (opposite sid

Descargado: 12   Tamaño del archivo: 2 mb   Fabricar: Apollo  
Categoría: La puerta automática
@name

STEP 5 GATE BRACKET INSTALLATION Activate push button on the side of the control box and extend the actuator until it stops (PULL TO OPEN only, leave actuator retracted for PUSH TO OPEN). WARNING: Do not let extension tube rotate as it extends. Do not insert fingers or tools in the hole at the end of the extension tube Align the hole in the end of the actuator extension tube with the holes in the gate bracket and locate gate bracket mounting position with the gate in the closed position. Weld or

Descargado: 0   Tamaño del archivo: 1 mb   Fabricar: Apollo  
Categoría: La puerta automática
@name

This hard shutdown condition can only be reset by shorting the FIREBOX or UL connectors on the left side of the circuit board to ground. If a firebox is used in the installation, The firebox door should be opened and closed to reset the circuit board. Once the operator is installed or if the control board is replaced, you will need to program the control board for proper current sensing. The operator should be functional and the open and close limits set. 1. Push and hold the LED ENABLE button f

Descargado: 6   Tamaño del archivo: 1 mb   Fabricar: Apollo  
Categoría: La puerta automática
@name

3 Applications .............................................................. 4 Pre-Installation Checklist ........................................ 5 Parts Identification ................................................... 6 Operator Installation ................................................ 7-9 Pivot Arm Installation Actuator Installation Control Box Installation Connecting the Actuator Gate Bracket Installation Limit Switch Adjustment Control Board Connections Control Board Adjustments - Le





Categoría