|
Resumen del manual
6. The electrical supply for this product must include a suitably rated switch or circuit breaker to open all ungrounded supply conductors to comply with Section 422-20 of the National Electrical Code/USA, ANSI/NFPA 70. The disconnecting means must be readily accessible to the spa’s occupant but installed at least 5 feet (1.5m) from spa water. 7. The electrical circuit supplied for the spa must include a suitable ground fault circuit interrupter (GFCI) as required by NEC/USA Article 680-42. 8. To gain access to the spa’s power terminal block, remove the screws securing the synthetic cabinet panel under the control panel (Figure A). Then remove the four control box door screws and door (Figure B). 9. Select the power supply inlet you want to use (Figure A). Feed power cable to control box, then install it through the large opening provided in the bottom side of the box. 10. Connect wires, color to color, on terminal blocks TB1 and TB3 (Figure C, page 17). TIGHTEN SECURELY! All wires must be hooked up securely or damage could result. 11. Install control box door and screws and reinstall the cabinet side panels. Figure A Equipment Area10437122FlowNote: Pump Locations Vary by ModelCirculation PumpBehind Load Box85669111. Control Box2. Power Supply Entrance(s) 3. 2-Speed Jets Pump #14. Heater5. Spa Drain Valve6. Pump Drain Plugs(s) 7. 1-Speed Jet Pumps #28. Circulation Pump9. Optional CD Ozonator (Purchase Separately) 10. Factory Installed Ozone Injector11. Control Panel Figure B Control BoxTB13211. Terminal Block2. Bonding Lug3. Grounding Terminal GRNWHTWHTBLKBLKBLKRED123Figure-CTB1to Circuit BoardPower InGRNWHTWHTBLKBLKBLKREDREDRED123Figure-DTB1to Circuit BoardPower InMove Red Wire HereNorth American Convertible Models: 120 VAC, 3-Wire Connection 60 HzNorth American Convertible Models: 240 VAC, 4-Wire Connection 60 Hz Caution (For 4-wire 240 VAC Heater Operation): Move the red wire on the main terminal strip (TB1) from position #1 to position #3. Make certain wires are connected exactly as shown in Figure D before applying power. Failure to do so will result in damage to the circuit board and/or related components and void the manufactures warranty. BLKREDREDREDBLKBLK12Figure-ETB1to Circuit BoardPower InGreenTB312BLUEBLUEBROWNBROWNFigure-FTB1to Circuit BoardPower InGreenTB3North American 240V Models: 240 VAC, 3-Wire Connection 60 HzAll Export Models: 230 VAC, 3-Wire Connection 50 Hz 8.0 Spa Fill Up Procedure For best results, read each step in its entirety before proceeding with that step. 1. Prepare The Spa For Filling Clear all debris from the spa. (Although the spa shell has been • polished at the factory, you may want to treat it with a specially formulated spa cleaner.) Consult your authorized Jacuzzi dealer for additional information prior to filling spa. Remove filter cover, then remove filter cartridge as outlined in • Section 12.1 (page 30). 2. Fill Spa Place the end of your garden hose into the empty filter bucket.• CAUTION: TO DECREASE BUILD UP ON COMPONENTS AND MINIMIZE ACRYLIC DAMAGE. Never fill with water from a water softener. If your water is extremely “hard”, it is preferable to fill half-way with hard water and the rest of the way with softened water. You may fill entirely with hard water if you use a special water additive available from your Jacuzzi dealer. !• WARNING: to decrease RISK OF infection or disease. Fill hot tub with clean tap water from garden hose, to reduce risk of contracting a waterborne illness (e.g. an infection, bacteria or virus) and/or respiratory ailments. Fill until water covers all jets but does not touch the bottom of the lowest headrest. (DO NOT OVERFILL!) IMPORTANT: Always fill your spa through the filter bucket after draining. Failure to do so may cause air to be trapped in either pump, preventing the pump from circulating water. Remove the hose and replace the filter cartridge. Note: DO NOT overtighten filter cartridge, finger tight only! 3. Turn On Power Turn on power to spa at the home’s circuit breaker to start boot up sequence (sec. 10.0, page 25). The heater and filter pump will automatically activate after several seconds. If the control panel LED flashes water temperature and “COL” or “ICE” this is normal, refer to page 38 for additional information. 4. Activate Jets Pumps Turn on jets pump(s) to ensure proper mixing when adding start-up chemicals in step 5. 5. Add Start-Up Chemicals Add the spa water chemicals as recommended by your authorized Jacuzzi dealer. See Section 13.0 “Water Quality Maintenance” (page 36) for general guidance. WARNING: Risk of poisoning or death. Never leave chemicals opened and accessible to anyone. Use chemicals according to the vendors instructions. Always store chemicals in a safe and/or locked location. Keep away from and out of reach of children. ! 6. Establish A Stable Sanitizer Reading Establish a stable sanitizer reading between 3.0-4.0 ppm chlorine or 2.0- 4.0 ppm bromine. To ensure healthy water conditions, always main...
Otros modelos de este manual:Piscinas - J - 355 (5.22 mb)
Piscinas - J - 365 (5.22 mb)