|
Resumen del manual
The distance from one end of the elbow to the centerline of the opposite leg is 13" as shown. 3. Join the tube ends of the body sections and the elbow together and secure with tube couplings as described in Section 11. (Optional) 13) ADDING OPTIONAL CORNER REFLECTOR (LTS ONLY) 1. Place the corner reflector over the reflectors of both body sections. 2. Secure by sliding speed clips on the reflector edges. One speed clip is required for each side of reflector. 3. The corner reflector can be used only when the long axis of the heater is level and mounted in a horizontal position. 14) ATTACHING CONTROL BOX ASSEMBLY_ 1. Attach the control box and gasket to end of tube flange and secure with 1/4-20 locknuts. NOTE: The control box must be mounted to a 10 ft. aluminized steel body section regardless of configuration used. 2. A 3/8” connector is located on the left side of the controi cabinet to provide strain relief for field wiring to the draft inducer junction box (refer to Section 22 on Electrical Connections and Connection Wiring Diagram for wiring between the control box and the draft inducer.) -8- Form #43155010 Fob-04 4. Assemble the end reflector (packaged in the control/draft inducer package) flush with the end of the main body reflector. Secure by sliding speed clips onto the reflector edges. Evenly space the speed clips on the sides (one each side) and top (two required) of the reflectors to provide a snug fit. Leave a 3" space between the end reflector and the control box assembly. The control box must be mounted with the perforated fresh air plate on top, facing the ceiling. NOTE:The wiring connection diagram is located on the inside access panel and on the inside junction box panel Heater Body Clearances to Combustibles Label Burner Sight Glass 'Access Panel -Lighting & Shutdown Instructions -1/2” MPT Gas Pipe Connection 15) ATTACHING DRAFT INDUCER ASSEMBLY 1. Attach the draft inducer assembly and gasket to end of tube flange and secure with 1/4-20 locknuts. A flue restrictor plate is loosely attached to the draft inducer weld studs. Make sure this remains in place while the draft inducer is being attached to the heater body. NOTE: The draft inducer can be mounted in a vertical, a 45°, or a horizontal position. Refer to the diagram on Multiple Hanging and Draft Inducer Positions (Section 16). 2. Disconnect the piece of SJO cable (if equipped) from the junction box and discard. This is used only on LTU series heaters. 3. The 3/8" connector used to hold the SJO cable will remain to provide strain relief for field wiring of the control box and the draft inducer (refer to the Electrical Connections and Connection Wiring Diagram for wiring between the control box and the draft inducer in Section 22). 4. Place the starting collar on the draft inducer and secure with #8-32 screws and nuts. 5. If heater is to be VENTED to the outside of the building, place the flue pipe directly onto the starting collar and secure with #8...
Otros modelos de este manual:Eléctrico - LTS 100 (1.33 mb)
Eléctrico - LTS 110 (1.33 mb)
Eléctrico - LTS 120 (1.33 mb)
Eléctrico - LTS 125 (1.33 mb)