|
Resumen del manual
5 (127) 8-1/4 (209) 14 (356) 12 (305) 19 (483) Figure 5 - Minimum Distance to Unprotected Side Wall Top View of fireplace 45o Protected wall shown in white Inches (millimeters) Combustible materials may project beyond one side of the fireplace opening as long as they are kept within the shaded areas illustrated here. Combustible Materials Allowed In Shaded Area “Safe zone” Combustible walls shown in dark gray. At 14" minimum side wall clearance, a combustible wall can project to any length. At 8-1/4" side wall clearance, a combustible wall can project 12". 8 (203) 2 (51) 4 (102) 6 (152) 8 (203) 10 (254) 12 (305) 10 (254) 14 (356) 18 (457) 16 (406) 12 (305) Top of Appliance inches (millimeters) Mantel depth Note -Hood shown as positioned. Figure 6 - Minimum Mantel Clearances Header NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE. pre-Installation Steps (Remove Glass Enclosure Panel) The appliance is shipped with all gas controls and components installed and pre-wired. Note: Remove the glass enclosure panel before installing the fireplace. To remove the glass enclosure panel: 1. Remove the shipping carton, and then remove the shipping pad, exposing the front glass panel. 2. Open the two latches securing the glass panel (under the firebox floor). 3. Remove the glass panel by tilting it outward at the bottom and lifting it up. 4. Set aside the glass enclosure panel in a safe location to protect it from inadvertent damage. TYPICAL INSTALLATION SEQUENCE The typical sequence of installation is outlined below, with page number references to the related detailed instructions. NOTE: Each installation is unique and may result in variations to these steps. Step 1. (Pages 8–10) Construct the appliance framing. Position the appliance within the framing and secure with nailing brackets. IMPORTANT! Bend up the appropriate top standoff spacers for the drywall/finish material thickness to be used (see Figure 7). Bend up the outer pair for 1/2" materials and the inner pair for 5/8" materials. Bend up the outer pair for 1/2" materials and the inner pair for 5/8" materials. Bend out the appropriate nailing flanges for the drywall/finish material to be used. Nailing flanges are provided for flush framing, 1/2 inch and 5/8 inch framing depths (see Figure 7). Step 2. (Page 11) Route the gas supply line to the appliance location. Step 3. (Page 11) Install the vent system and exterior termination. Step 4. (Page 12) Install field wiring. a. Millivolt Appliances: Install the operating control switch (not factory provided). b. Electronic Appliances: Field wire and install operating control switch. Step 5. (Page 14) [OPTIONAL]: Install outside supplemental combustion air kit. Step 6. (Page 15) Make connection to gas supply. Step 7. (Page 16) Verify appliance operation. Step 8. (Page 17) Install the logs, decorative volcanic stone, and glowing embers. Step 9. (Page 20) Install the glass enclosure panel. Step 10. (Page 20) Adjust burner air shutter to ensure proper flame appear...
Otros modelos de este manual:chimeneas - SLBV-35NE (2.89 mb)
chimeneas - SLBV-35NE (2.89 mb)
chimeneas - SLBV-35NE (2.89 mb)
chimeneas - SLBV-35NE (2.89 mb)