|
Resumen del manual
8d Nail 8d Nail Figure 9 Note:The nailing flange and the area directly behind the nailing flange is exempt from the clearances described on the firebox clearance label. Step 5. To safely operate the heater with consideration of the mantel clearances the canopy must be installed. Canopy Installation The factory-supplied canopy must be installed on the firebox for safe operation. SeeFigure 10. UVF-500 Shown UVF-500 Canopies Firebox Opening UVF-600 Canopies Firebox Opening Attaching Screws 3 Screws for 500 Models 4 Screws for 600 Models Figure 10 Step 1. Remove the screws from the top front frame assembly. There are three (3) screws on the 500 models and four (4) screws on the 600 models. Step 2. Align the canopy with the holes in the top frame. Step 3.Replace the screws previously removed. Step 4. Tighten side screws. Make sure the canopy is level and secure. OPTIONAL EQUIPMENT Blower Kit Circulating Models Only If you are installing one of the blower kits, Models FBK-100 or FBK 200, follow Steps 1 through 5, and see the installation instructions provided with the kit for electrical wiring requirements (see Figure 11 ). The firebox must be connected to main power supply at time of installation if a forced air kit is to be installed later. The electrical connections must be made before the firebox is framed and enclosed in the finished walls. This appliance must be electrically grounded in accordance with local codes or, in the absence of local codes, the national electrical code, ANSI/NFPA 70 - (Latest Edition). CAUTION: ELECTRICAL CONNECTIONS SHOULD ONLY BE PERFORMED BY A QUALIFIED, LICENSED ELECTRICIAN. MAIN POWER MUST BE OFF WHEN CONNECTING TO MAIN ELECTRICAL POWER SUPPLY OR PERFORMING SERVICE. Grounded to Appliance Blower Motor Motor Plug Receptacle 120V Appliance Junction Box NOTE: If any of the original wire as supplied must be replaced, it must be replaced with typeAWM 105°c – 18Ga. wire Figure 11 Blower Kit Installation To install the blower kit, follow Steps 1 thru 5 and refer to Figures 12, 13 and 14. Step 1. Locate the blower motor shield. Step 2. Remove the motor shield by bending it along the perforation until the tabs break away. Step 3. With the motor shield removed, place the blower in the unit with the power cord up and slide to the back of the unit until the motor is behind the rear support. Step 4. Rotate the blower 90 degrees, so that the discharge is up. Step 5. Move left side of blower around until it is in the proper position and bend the retaining tabs in the bottom of the unit up into the slots on the blower. Blower Motor Motor Shield Figure 12 Perforation Tabs Motor Shield Removed Figure 13 Rotated Blower In Final Position Figure 14 NOTE: DIAGRAMS & ILLUSTRATION NOT TO SCALE. FIREBOX FINISHES FIREBOX FINISHES Only noncombustible materials like marble, stone, tile, brick, etc. may overlap the black front facing but be sure not to block the upper or lower grilles. Seal all joints between the black facing and wall surrounds t...
Otros modelos de este manual:chimeneas - UNVENTED FIREBOXES UVFC-500 (2.24 mb)
chimeneas - UNVENTED FIREBOXES UVFC-600 (2.24 mb)
chimeneas - UNVENTED FIREBOXES UVFC-500 (2.24 mb)
chimeneas - UNVENTED FIREBOXES UVFC-500 (2.24 mb)