Manual de usuario Regency, modelo UNVENTED FIREBOXES UVFC-500

Fabricar: Regency
Tamaño del archivo: 2.24 mb
Nombre del archivo: Lennox_Hearth_UVFC_Installation_700018.pdf
Idioma del manual:en
Enlace gratuito para este manual disponible en la parte inferior de la página



Resumen del manual


Usually, no special floor support is needed for the firebox, however, to be certain: 1. Estimate the total weight of the firebox system and surround materials such as marble, brick, stone, etc., to be installed. 2. Measure the square footage of the floor space to be occupied by the system and surrounds. 3. Note the floor construction, i.e. 2 x 6’s, 2 x 8’s or 2 x 10’s, single or double joists, type and thickness of floor boards. 4. Use this information and consult your local building code to determine if you need additional support. CAUTION: DO NOT BLOCK THE HEAT-CIRCULATING AIR INLETS AND OUTLETS ON THE VFC AND VFCE MODELS. DOING SO MAY CREATE A POTENTIAL FIRE HAZARD. If you plan to raise the firebox, build the platform assembly then position firebox on top. Secure the platform to the floor to prevent possible shifting. UVF-500 SPECIFICATIONS 40" (1016 mm) Front 37" (940 mm) 7 ...." (183 mm) 36" (914 mm) 2" (51 mm) 20 ...." (513 mm) 9 ..." (244 mm)7 ..." (191 mm) 27 ..." (708 mm) Fireplace Top Spacer 42" (1067 mm) Gas Line Access 20 ..." (514 mm) Left Side Gas Line Access 9 ...." (230 mm) 9 ...." (233 mm) 32" (813 mm) 37" (940 mm) 37" (940 mm) Junction Box 19 ..." (498 mm) Right Side 27 ..." (692 mm) (514 mm) 40" (1016 mm) 20 ..." FireplaceTop Spacer 1" (25 mm) 42" (1067 mm) Top View Figure 4 NOTE: DIAGRAMS & ILLUSTRATION NOT TO SCALE. Firebox Installation Firebox Installation quirements identified in this manual. Step 1. Slide the firebox into prepared framing or position firebox in its final position and frame later. Step 2. Refer to firebox and framing specifications on pages 6, 7and 8 Figures 6 through 10 for framing dimensions and details. Framing header may be positioned directly on the firebox top spacers. Note:The framed depth from a framed wall, must always be measured from a finished surface.If a wall covering such as drywall is to be attached to the rear wall, then the depth must be measured from the drywall surface.It is important that this dimension be exact. IMPORTANT: UNDER NO CIRCUMSTANCES SHALL THE FIREBOX TOP SPACERS BE REMOVED OR MODIFIED. THE HEADER MAY BE IN DIRECT CONTACT WITH THE TOP SPACERS BUT MUST NOT BE SUPPORTED BY THEM OR NOTCHED TO FIT AROUND THEM. Step 3. Level the firebox by checking the top edge of the firebox. Shim if necessary. Step 4. Fireplace should be secured to side framing members using the full length nailing tabs at the top and bottom of the fireplace front face. Use 8d nails (see Figure 9). UVF-600 SPECIFICATIONS 45" (1143 mm) 31 ...." (802 mm) 21 ..." (540 mm) Right Side Gas Line Access Junction Box 9 ..." (251 mm) 43" (1092 mm) 21 ..." (540 mm) 20 ..." (524 mm) Left Side 45" (1143 mm) Front 43" (1092 mm) 7 ...." (183 mm) 41" (1041 mm) 2" (51 mm) 22 ...." (566 mm) 13 ..." (340 mm) 8 ..." (213 mm) Fireplace Top Spacer Fireplace Top Spacer Gas Line Access 10" (254 mm) 1" (25 mm) 38" (965 mm) 47" (1194 mm) 29 ..." (752 mm) 47" (1194 mm) Top View Figure 5 NOTE: DIAGRAMS & ILLUSTRATION NOT TO SCALE. FRAMIN...

Otros modelos de este manual:
chimeneas - UNVENTED FIREBOXES UVFC-500 (2.24 mb)
chimeneas - UNVENTED FIREBOXES UVFC-600 (2.24 mb)
chimeneas - UNVENTED FIREBOXES UVFC-500 (2.24 mb)
chimeneas - UNVENTED FIREBOXES UVFC-500 (2.24 mb)

Comentarios



Tu reseña
Tu nombre:
Introduzca dos números de la imagen:
capcha





Categoría