|
Resumen del manual
Secure all pipes and the shower and tub drop ells. Use thread seal tape on all threads. Flushing IMPORTANT: Before closing all wall openings, pressure test valve and complete sys- tem using flushing instructions Pipe chips, sand and other solids found in new and renovated plumbing can damage the sealing surfaces of the cartridge causing a leak or cause the spool to become blocked. To avoid damage, DO NOT TURN ON SUPPLY VALVES until instructed below. Make sure both hot and cold supplies are off. Rotate the cartridge stem until the notched flat points up to relieve pressure and insure complete shut-off. Remove the cartridge assembly (see "Disassembly"). Slowly turn on both hot and cold supplies and thoroughly flush out the body and lines. Close the hot and cold supplies and replace the cartridge assembly (see "Reassembly"), turn on both supplies and check the system for leaks. If the balancing spool becomes stuck, it will be apparent at the trim-out test in that the valve will deliver only a small trickle of water, or it will deliver only hot or cold water. If this occurs, proceed as follows: Make sure that both the hot and cold water service lines are "ON". Also make sure that both rubber stop valves are open (stop models). The valve WILL NOT OPERATE unless both supplies are "ON". If the valve still does not function properly, turn off BOTH the hot and cold supplies and remove the cartridge assembly. A cartridge twisting tool is required for this. The inner spool in the cartridge assembly should shake back and forth freely. If this does not happen, remove the stem assembly from the cartridge sleeve, remove the cap from the stem assembly and remove the balance spool. Sometimes the stem assembly may have to be jarred to free the spool. Carefully clean any foreign material from the balance spool and stem assembly and reassemble (see illustration). CAUTION: DO NOT DAMAGE O-RINGS. The spool should move back and forth after the stem assembly is cleaned. If spool still does not free up, replace the entire cartridge assembly. 7" SHOWER TUB 2-5/16" C.C. & I.P.S. 4-13/16" C.C. 4-5/16" NOMINAL SUPPLY 4-1/2" PLASTER GROUND SIZE AND WALL OPENING 7" SHOWER TUB 2-3/4" C.C. & I.P.S. SUPPLY CAUTIONThisvalveisequippedwiththeMoenlong-lifePOSI-TEMPcartridge, designedforsmooth,trouble-freeoperation.Whensolderingdonotheatvalveanyhigherthannecessarytoflowthesolder.Overheatingmaydamagethecartridgeorrubberstopvalves. Followingthisdirectionwillallowyoutosolderwithoutremovingthecar- tridgeorrubberstopvalves. WARNING:ThecartridgeandrubberstopvalvesMUSTberemovedbeforeeitherbrazingorresistance(electric) soldering. CLIP/BARS ORIENT THE CLIP IN THE SPOOL AND THE CAP FINGERS AS SHOWN ABOVE. Make sure O-rings are free of foreign material and are lubricated. Re-assemble stem assembly into cartridge sleeve. Re-assemble cartridge into valve. (See "Reassembly"). Turn both water supplies on. The valve should fun...
Otros modelos de este manual:equipamiento barco - 12189 (234.14 kb)
equipamiento barco - 12242 (234.14 kb)
equipamiento barco - 12341 (234.14 kb)
equipamiento barco - 12342 (234.14 kb)