Iniciar sesión:
Votos - 1, Puntuación media: 5 ( )

Manual de usuario Conair, modelo PD3

Fabricar: Conair
Tamaño del archivo: 216.57 kb
Nombre del archivo:
Idioma del manual:en
Enlace gratuito para este manual disponible en la parte inferior de la página



Resumen del manual


Incoming voltage and current must match the electrical specifications on the pump data plate and serial tag. Check for proper rotation of the pump after power has been connected and before operation. Install vacuum lines to loader stations and the dust collector. Connect the dust collector vacuum outlet to the pump inlet. INSTALLATION AND OPERATION NOTE: The pump inlet is equipped with a vacuum relief valve to prevent the vacuum from exceeding 12 in. Hg. Excessive vacuum will reduce the life of the pump and can destroy it. For special applications requiring a higher vacuum level, consult Conair service. If the vacuum relief valve is adjusted by any person other than a factory service representative, the warranty is voided. INSTALLING THE PUMP IMB036/0898 Positive Displacement Pump Positive Displacement Vacuum Pump Central Vacuum Line Material Inlet Material Receivers Receiving Hoppers Central Dust Collector PREVENTATIVE MAINTENANCE SCHEDULE To maintain the best performance, you should follow the maintenance recommendations outlined here and in any included manuals from component manufacturers. l Weekly, or as often as needed r Check and clean the pump inlet filter. An inlet filter has been provided to protect the pump from solid material that can enter and damage the pump impellers. material can enter the vacuum line if a loader filter is improperly installed or if if has a hole in it. Replace the pump inlet filter if it is torn or worn. r Check all V/belts. The V/belts have a tendency to stretch, so an adjustable motor base is provided. Keep belts tight to prevent slippage and wear. Do not use belt dressings. l Every 500 hours of operation r Grease the pump. Use No. 2 bearing grease or the equivalent. Refer to manuals from the component manufacturer for additional information and instructions. l Every 1500 hours of operation r Change the oil. The vacuum pump has been filled with the proper oil and tested by Conair before shipment. Even so, this oil should be changed periodically. Use SAE 40 regular or an equivalent oil. l Every three months r Check motor bearings and grease, if necessary. The motor is equipped with double-shielded ball bearings having sufficient grease to last indefinitely under normal service. But if the motor is used constantly in dirty, wet or corrosive atmospheres, you should add 1/4 oz. of grease per bearing every three months. Use a quality, rust-inhibiting, polyure-based grease such as Chevron SRI. Refer to the motor manual for additional instructions. Positive Displacement Pump IMB036/0898 Conair has made the largest investment in customer support in the plastics industry. Our service experts are available to help with any problem you might have installing and operating your equipment. Your Conair sales representative also can help analyze the nature of your problem, assuring that it did not result from misapplication or improper use. To contact Customer Service personnel, call: From outside the United States, call: 814-437-6861 You can commission Conair service personnel to provide on- site service by contacting the Customer Service Department. Standard rates include an on-site hourly rate, with a one-day minimum plus expenses. If you do have a problem, please complete the following checklist before calling Conair: . Make sure you ha...

Otros modelos de este manual:
Equipos de Bombeo - 5 (216.57 kb)
Equipos de Bombeo - 7.5 (216.57 kb)
Equipos de Bombeo - 10 (216.57 kb)

Comentarios



Tu reseña
Tu nombre:
Introduzca dos números de la imagen:
capcha





Categoría