Iniciar sesión:
Votos - 4, Puntuación media: 4 ( )

Manual de usuario Giant, modelo THE EAGLE LINE P221

Fabricar: Giant
Tamaño del archivo: 163.2 kb
Nombre del archivo:
Idioma del manual:en
Enlace gratuito para este manual disponible en la parte inferior de la página



Resumen del manual


The following information is to be considered as a general outline for installation. If you have unique requirements, please contact Giant Industries, Inc. or your local distributor for assistance. 1. The pump should be installed flat on a base to a maximum of a 15 degree angle of inclination to ensure optimum lubrication. 2. The inlet to the pump should be sized for the flow rate of the pump with no unnecessary restrictions that can cause cavitation. Teflon tape should be used to seal all joints. If pumps are to be operated at temperatures in excess of 1600 F, it is important to insure a positive head to the pump to prevent cavitation. 3. The discharge plumbing from the pump should be properly sized to the flow rate to prevent line pressure loss to the work area. It is essential to provide a safety bypass valve between the pump and the work area to protect the pump from pressure spikes in the event of a blockage or the use of a shut-off gun. 4. Use of a dampener is necessary to minimize pulsation at drive elements, plumbing, connections, and other system areas. The use of a dampener with Giant Industries, Inc. pumps is optional, although recommended by Giant Industries, Inc. to further reduce system pulsation. Dampeners can also reduce the severity of pressure spikes that occur in systems using a shut-off gun. A dampener must be positioned downstream from the unloader. 5. Crankshaft rotation on Giant Industries, Inc. pumps should be made in the direction designated by the arrows on the pump crankcase. Reverse rotation may be safely achieved by following a few guidelines available upon request from Giant Industries, Inc. Required horsepower for system operation can be obtained from the charts on pages 3-9. 6. Before beginning operation of your pumping system, remember: Check that the crankcase and seal areas have been properly lubricated per recommended schedules. Do not run the pump dry for extended periods of time. Cavitation will result in severe damage. Always remember to check that all plumbing valves are open and that pumped media can flow freely to the inlet of the pump. Finally, remember that high pressure operation in a pump system has many advantages. But, if it is used carelessly and without regard to its potential hazard, it can cause serious injury. IMPORTANT OPERATING CONDITIONS Failure to comply with any of these conditions invalidates the warranty. 1. Prior to initial operation, add oil to the crankcase so that oil level is between the two lines on the oil dipstick. DO NOT OVERFILL. Use Giant 20W-50 oil (p/n 01153) Crankcase oil should be changed after the first 50 hours of operation, then at regular intervals of 500 hours or less depending on operating conditions. 2. Pump operation must not exceed rated pressure, volume, or RPM. A pressure relief device must be installed in the discharge of the system. 3. Acids, alkalines, or abrasive fluids cannot be pumped unless approval in writing is obtained before operation from Giant Industries, Inc. 4. Run the pump dry approximately 10 seconds to drain the water before exposure to freezing temperatures. 2 Specifications Model P217A U.S...............................Metric 1750 RPM+ Flow (Continuous) @ 2000 PSI (140 Bar)......1.8 GPM......................6.8 LPM Flow (Intermittent) @ 2500 PSI (175 Bar)......1.8 GPM......................6.8 LPM 3450 RPM+ Flow (Continuous) @ 2000 PSI (140 Bar)......3.3 GPM......................12.5 LPM Flow (Intermittent) @ 2500 PSI (175 Bar)......3.3 GPM......................12.5 LPM Maximum Inlet Pressure....................................145 PSI........................10 bar Plunger Diameter...............................................0.71”............................18 mm Stroke..................................................................0.22”............................5.5 mm Max. Temperature of Pumped Fluids...............160° F...........................71oC Inlet Ports...................................................................................................(2) 1/2" BSP Discharge Ports.........................................................................................(2) 3/8" BSP Shaft Rotation.......................................................Top of Pulley Towards Fluid End Crankshaft Diameter..........................................0.98”............................24 mm Key Width..........................................................0.31”............................8 mm Shaft Mounting...................................................Right Side Facing Manifold Weight.................................................................11.7 lbs........................5.3 Kg Crankcase Oil Capacity.....................................7.5 fl.oz.......................0.22 Liter Extended Crankcase Oil Capacity....................9.0 fl.oz.......................(0.27 Liter Volumetric Efficiency @ 1750 RPM ....................................................

Otros modelos de este manual:
Equipos de Bombeo - THE EAGLE LINE P218 (163.2 kb)
Equipos de Bombeo - THE EAGLE LINE P217 (163.2 kb)
Equipos de Bombeo - THE EAGLE LINE P219 (163.2 kb)
Equipos de Bombeo - THE EAGLE LINE P220 (163.2 kb)

Comentarios



Tu reseña
Tu nombre:
Introduzca dos números de la imagen:
capcha





Categoría