|
Resumen del manual
Framing is of 2x4 construction. Make sure you allow for access to the pump in the event the unit requires service. When constructing the framing, allow for the thickness of sub and finished wall materials. If an apron wall without a ledge is desired, the finished apron wall surface must be 1/16” (2mm) under the bath rim. The whirlpool can be installed in a corner. Recess or sunken installations are also possible. Steps 1. through 3. below illustrate suggested stud construction. Modifications may be needed for other types of construction. NOTICE: Do not install the wood rim to units used in sunken installations. 40” (101.6cm) 1. Corner Installation: The construction is illustrated. suggested stud Kohler Co., Kohler WI U.S.A. 4 110050-2-AB 2. Recess Installation: The construction is illustrated. suggested stud 3. Sunken Installation: Refer to Roughing-In notes beginning on Page 1 for cut-out details. Make sure the whirlpool is supported by the supporting feet on the bottom of the whirlpool. Do not hang the whirlpool by the rim. D. PLUMBING PREPARATION Position the plumbing according to the roughing-in dimensions. Cap the supplies, and check for leaks. 6. BEFORE INSTALLING UNIT A. PARTIALLY INSTALL BATH DRAIN Install the drain on the bath according to the drain manufacturer’s instructions. When installing the drain overflow tube and hood, be sure to adequately seal along the edges of the hood to prevent leakage. B. INSTALL WOOD FLOOR RAIL Make sure all rough plumbing and finish flooring are complete. Attach the floor brackets to the floor rail with the screws provided. Apply two beads of silicone sealant to the bottom surface of the floor rail. Position the floor rail in the desired location, and secure to the floor with the screws provided. Use at least four people to carefully lift the bath inside the floor rail. Position the bath so there is equal space between the bath skirt and the floor rail. Insert the dowels in the ends of the floor rail. Apply silicone sealant to the end rails, and press them completely onto the dowels. Remove any excess sealant. Floor Rail Apply Silicone Sealant Dowel Screws Floor Bracket 110050-2-AB 5 Kohler Co., Kohler WI U.S.A. C. PROTECT BATH UNIT Position a clean drop cloth or similar material in the bottom of the whirlpool. Be careful not to scratch the surface of the product. 7. INSTALL THE WOOD RIM NOTICE: The wood rim must be installed to the bath before any framing is built around the bath. Do not use this wood rim in sunken installations. Install the bath, and make the drain connections. Use two people for this procedure. Hold the wood rim in position under the bath rim. Install the angle brackets to the wood rim, as illustrated, using #10 x 3/4” round-head screws. The holes are pre-drilled in the wood rim. Apply a bead of clear silicone sealant, as shown. CAUTION: Option for using silicone sealant: Do not let the bath rest on the rim, or damage to the wood rim and the ba...
Otros modelos de este manual:Otros accesorios para la casa - VINTAGE K-700 (98.74 kb)
Otros accesorios para la casa - VINTAGE K-7159 (98.74 kb)
Otros accesorios para la casa - VINTAGE K-7158 (98.74 kb)