Iniciar sesión:
Votos - 3, Puntuación media: 4.3 ( )

Manual de usuario Kathrein, modelo AOS 32

Fabricar: Kathrein
Tamaño del archivo: 413.73 kb
Nombre del archivo:
Idioma del manual:ende
Enlace gratuito para este manual disponible en la parte inferior de la página



Resumen del manual


Open the cable pull-secure clamp and the cable connection clamp. 4. Connect the cable and clamp in rmly. 5. Replace the cover and screw down rmly. 6. Install the cable so that it does not atter or is under any friction (e.g. with cable ties, isolating band or cable clamps). 7. To ensure that no water can ow into the mast or seep into walling lay the cable with a drip-bend ( g. 5). Antenna alignment Align the antenna for optimum reception by turning it. If necessary, use an antenna measurement device. Select any programme on the TV set or the measurement device for the antenna alignment. After nishing the alignment, tighten the wing screws on the mast clamp. Indication of the reception of DVB-T signals Kathrein antennas are pre-assembled for the reception of horizontally polarised signals. However, DVB-T signals are also transmitted in vertical polarisation. For DVB-T reception, turn the antenna in its longitudinal alignment to the transmitter rotated 90° counterclockwise. Observe the direction of rotation, as otherwise moisture can ingress in the connection box through the cable entry. If the antenna was properly mounted, the cable outlet points slantwise down, and the Kathrein-writing is legible horizontally-aligned (Fig. 7). If not, the Kathrein-writing is upside-down. Safety instruction: For your own safety, it is recommended that you carry out the mounting steps specified in the following on solid ground and not on the rooftop. Mounting steps: The following steps must be carried out in order to be able to mount the antenna on the mast so that vertically polarised signals can be received: 1. Unfasten the mast clamp from the axle tube by loosening the clamping screw 2. Pull off the mast clamp 3. Rotate the clamp 90° clockwise 4. Slide the mast clamp on the previous position on the axle tube 5. Then tighten the clamping screws again. 935.543/ C/ 0707/2.3e/ZWT Abb. 6: Horizontal alignment Abb. 7: Vertical alignment Technical data of the antennas Type AOP 52 AOS 32 AOS 65 AOT 65 Order Number 212347 212349 212352 212353 Channels 21...52 21...32 21...65 21...65 Gain dB 11...15 15,5...17 11...17 12...18 Reception range MHz 470...726 470...566 470...830 470...830 Full width at half maximum horiz.° 43...26 26...21 43...21 37...18 vert.° 52...32 30...23 47...23 39...19 Front-to-back-ratio dB 24...30 27...31 25...32 23...32 Mast clamp range mm O 22...60 Length mm 1380 2830 2240 2820 Wind load at 800 N/m2 N 108 203 179 192 Limiting wind load at 1100 N/m2 N 148 287 246 263 Packing unit/weight St./kg 1/2,3 1/3,8 1/3,5 1/3,7 Packing unit dimensions mm 890 x 520 x 100 1080 x 520 x 130 960 x 520 x 130 1080 x 520 x 130 Overview of the Kathrein antenna masts Type ZSD 48 ZSF 47 ZSF 48 ZSH 47 ZSH 48 ZSH 59 ZSH 622) Order Number 218380 218385 218381 218386 218394 218382 218383 Lenght L L/m 2 x 2 = 4 2 x 2,5 = 5 2 x 3 = 6 Diameter D1/D2 D1/D2/mm 40/48 40/48 40/48 40/48 40/48 48/60 48/60 Cable entry points 3 -3 -3 5 5 Quality category (steel) St 52 St 37 St 52 St 37 ...

Otros modelos de este manual:
receptores de satélite - AOP 52 (413.73 kb)
receptores de satélite - AOS 65 (413.73 kb)
receptores de satélite - AOT 65 (413.73 kb)

Comentarios



Tu reseña
Tu nombre:
Introduzca dos números de la imagen:
capcha





Categoría