Iniciar sesión:
Votos - 2, Puntuación media: 3.5 ( )

Manual de usuario Conair, modelo 15

Fabricar: Conair
Tamaño del archivo: 3.66 mb
Nombre del archivo:
Idioma del manual:en
Enlace gratuito para este manual disponible en la parte inferior de la página



Resumen del manual


(3.8 7.6 liters/min.) tower, city, or chiller water at temperatures of 40° to 85°F (4° to 29°C). Pipe should be run to the planned dryer location. Use flexible hose to connect the water pipes to the aftercooler and precooler. If the dryer has an optional flow control, see Appendix D for connection information. . .. Minimum clearance for safe operation and maintenance. You should maintain 24 in. (61 cm) clearance on at least three sides of the dryer. If the dryer is mounted with a hopper on a processing machine throat, clearance between the dryer and hopper can be 4 in. (10.2 cm). Regeneration exhaust Regeneration exhaust high temperature 6 in. (15.24 cm) needed to change filter 12 in. (30.48 cm) 12 in. (30.48 cm) needed to remove needed to remove optional aftercooler optional aftercooler coil for cleaning 3 in. (7.62 cm) coil for cleaning 3 in. (7.62 cm) high temperature 6 in. (15.24 cm) D-75 & D-100MinimumClearance 6 in. (15.24 cm) 3 in. (7.62 cm) D-15, D-25 & D-100MinimumClearance 3-4 l Installation Preparing for Installation (continued) . . .. A mounting surface that will support the weight of the dryer, support NOTE: If your mounting frame, and a fully-loaded hopper, or just the fully-loaded hopper. See the surface does not match specifications tables for weights and volumes. the standard bolt patterns available, you will need an adapter. You . .. Material and conveying lines installed. If you plan to use vacuum or can make an adapter compressed air loaders to fill the hopper, install conveying lines to the drying using the dimensions hopper location. provided or purchase one from Conair. 2 Drill and tap mounting holes or make adapter. Available discharge assemblies and slide gates fit mounting surfaces with these bolt patterns and diameters. 7/16 inches (1.11 cm) diameter 7/16 inches (1.11 cm) diameter 2 inches (5.08 cm) diameter 6 inches (15.24 cm) square 1 inch 4 inches (10.16 cm) square (2.54 cm) 5 inches diameter 3 inches (12.7 cm) (7.62 cm) square square 3Description Installation l 3-5 Tools for installation: . Flathead screwdriver . 9/16” and 1/2” wrench . Hoist . NOTE: You must position the dryer on the floor or mount it to an optional floor stand if your processing machine throat requires the small discharge assembly or a mounting plate with less than a 3 x 3 in. (7.6 x 7.6 cm) bolt pattern and 1 in. (2.54 cm) diameter opening. 3-6 l Installation Mounting the Dryer and Hopper on a Processing Machine WARNING: You are responsible for the structural integrity of this installation. We recommend that you: . ..Use bolts no smaller than 3/8 inch (M 10) when mounting the hopper/dryer combination to the throat of a processing machine. . .. Do not mount the hopper/dryer combination on a plate that swings away or slides away from the processing machine throat. Either remove the swing or slide plate, position the dryer on the floor, or mount the dryer to an optional floor stand. The dryer and hopper mount on a support frame / discharge assembly that bolts to the throat of the processing machine, as pictured above. CAUTION: To prevent accident and injury, lift the empty hopper and support frame onto the throat of the processing machine using a hoist and the lifting lugs provided. After the hopper is mounted, then lift the dryer onto the support frame using a hoist and the lifting lugs provided. Mounting the Dryer and Hopper on a Processing Machine (continued) The drying hopper, slide gate, support frame, and discharge assembly may have been shipped fully assembled. You can remove the hopper from the support frame, if you find it easier to lift and bolt the frame and then the hopper to the throat of the processing machine. 1 Lift the hopper, support frame, and discharge assembly onto the processing machine throat. Use a hoist to lift the support frame and hopper. Position the frame and discharge assembly so that its bolt holes line up with the holes drilled in the throat. If hole patterns do not match, you can place a mounting adapter between the throat and the support frame. 2 Bolt the frame and discharge assembly to the throat. Using four 3/8 in. -16 (M 10) self-locking bolts, fasten the support frame and discharge assembly to the throat. The bolts must be long enough to reach at least 1/2 in. (1.25 cm) into the processing machine throat or mounting adapter after passing through the discharge assembly and support frame. . NOTE: If you removed the hopper from the support frame, lift the hopper onto the frame using a hoist. Make sure the slide gate is positioned in the recess on the bottom of the hopper base plate. Align the bolt holes and fasten the base plate to the discharge assembly using the four 3/8 in. -16 (M 10) self-locking bolts provided. 3 Lift the dryer onto the support frame using a hoist and the lifting lugs provided. Align the four bolt holes on the bottom of the dryer with the four bolt holes on the top of the support frame. Fasten the dryer to the frame with 5/16 in. -18 bolts. Installation ...

Otros modelos de este manual:
Secadoras - 25 (3.66 mb)
Secadoras - 50 (3.66 mb)
Secadoras - 75 (3.66 mb)
Secadoras - 100 (3.66 mb)

Comentarios



Tu reseña
Tu nombre:
Introduzca dos números de la imagen:
capcha





Categoría