|
Otros manuales para este modelo:
Resumen del manual
HP StorageWorks
Key installation steps include:
Before you begin
Selecting the interconnect bay
1.
Getting started
6Gb SAS BL Switch Installation
HP BladeSystem c-Class enclosure interconnect bays map to servers via
2.
Planning the configuration
CAUTION:
the slots in which the mezzanine cards are installed in the server blades.
Instructions
3.
Selecting the interconnect bay
When selecting an interconnect bay for a switch, make sure that the
• Removing a module can significantly change air flow within
4.
Installing the switch
selected bay maps to the desired server blades. For information about
an operating enclosure. Each enclosure bay must be populated
mappings, see the user documents for your BladeSystem c-Class enclosure
5.
Accessing the switch
with a module or blanking panel for the enclosure to cool
model. For information about supported mezzanine cards, see the HP
6.
Updating switch firmware
properly. Remove a module or blanking panel from an enclos-
6Gb SAS BL Switch QuickSpecs.
ure bay only when a new module is available to install in that
7.
Connecting cables to the switch
bay.
8.
Configuring the switch
• Parts can be damaged by electrostatic discharge. Use proper
IMPORTANT:
anti-static protection. For more information, see HP c-Class
This switch can be deployed in both single- and dual-domain
BladeSystem or SAS BL Switch user guides.
Front panel and LED definitions
environments. When used in dual-domain configurations, the
• For safety information and regulatory notices, see the SAS BL
two switches must be installed in the same row of the
Switch user guides.
BladeSystem c-Class enclosure.
This document details procedures for installing an HP
StorageWorks 6Gb SAS BL Switch in an HP
BladeSystem c-Class enclosure.
Getting started
Installing the switch
• Familiarize yourself with information available on the HP BladeSystem
website: http://www.hp.com/go/bladesystem.
NOTE:
• Navigate through the HP BladeSystem website to learn more about
Off
Normal
BladeSystem c-Class enclosures, this SAS BL Switch, mezzanine
• Make sure that mezzanine cards are installed in server
cards, servers, and other BladeSystem components. Product pages,
mezzanine slots that map to the selected BladeSystem c-Class
1
Unit ID LED
Solid—Being identified
overviews, QuickSpecs, and user documents for all BladeSystem
enclosure interconnect bay.
Blue
Blinking—Firmware is being updated
products are accessible from this website.
• The 6Gb SAS BL Switch may be hot-installed in an operational
• Scroll down the left pane of the HP BladeSystem website and click
enclosure.
Off
Not powered up
Technical Resources to access to the HP BladeSystem Technical
• The 6Gb SAS BL Switch does not have a power on/off button.
Resources page. Tabs across the top of this page provide access
Power is automatically applied or removed when the switch is
points to planning, installation, maintenance, and troubleshooting
installed or removed from the enclosure. Power can also be
© Copyright 2011 Hewlett-Packard Development Company, L.P.
Green
Solid—Healthy
2
Health LED
information. User documents for all BladeSystem components are
applied or removed through the Onboard Administrator applic-
Second edition: April 2011
Blinking—Error, there is a problem
located on the Installing tab.
ation.
Amber
with the switch
• Obtain the following documents; they are needed when planning,
• Connect SAS cables to external storage enclosures only after
The information in this document is subject to change without notice.
installing, and configuring the switch:
confirming that the desired firmware version is installed on the
switch.
www.hp.com
3
Locking latch handle
• HP BladeSystem Deployment Guide for Solutions with 6Gb SAS
BL Switches and External SAS Storage Enclosures
No link between the port and external
Off
• HP 6G Virtual SAS Manager User Guide
storage enclosure
1.
Remove the air baffle from the selected interconnect bay.
• HP StorageWorks 6Gb SAS BL Switch User Guide
Solid—Link between port and external
• HP BladeSystem 6Gb SAS BL Switch QuickSpecs
storage enclosure is established
These documents are available on the BladeSystem Technical Re-
Steady blinking (1Hz)—Switch
sources page (described above) and on the HP Manuals page at
hardware or software is starting up.
nl
4
Link LED
http://www.hp.com/support/manuals.
Access to the switch and its VSM
Green
software is restricted and server blades
with SAS mezzanines mapped to the
switch interconnect bay are restricted
Planning the configuration
from starting up.
Irregular blinking—There is activity on
For both single- and dual-domain deployments, a variety of cabling and
the established link
configuration strategies are available. Consider the server blades,
switches, external storage enclosures, and external backup devices in
your deployment and develop plans for cabling the external devices and
Off
Normal
for zoning the switch to control access to the storage.
Solid—Link error, there is a problem
For assistance, HP recommends using the HP BladeSystem Deployment
5
Fault LED
with the SAS port on the switch or
Guide for Solutions with 6Gb SAS BL Switches and External SAS Storage
Amber
external storage enclosure, or with the
Enclosures. The deployment guide provides guidelines, instructions, and
SAS cable
configuration examples for solutions centered around an HP BladeSystem
*634037-002*
c-Class enclosure with server blades, SAS BL switches, SAS mezzanine
6
SAS ports (to external devices)
cards, and external SAS storage enclosures.
...Otros modelos de este manual:
datos de dispositivos de procesamiento - HP 6Gb SAS Switch Single Pack for HP BladeSystem c-Class (195.17 kb)