Fabricar: Regency
Tamaño del archivo: 3.72 mb
Nombre del archivo: 758afecd-e83e-476f-865b-aee30a75a7ee.pdf
|
Resumen del manual
Connect the wiring harness to the back of the receiver. 5. Install the Receiver in the Low Voltage Junction box, supplied with HZ54. 6. Insert the 4 AA type batteries in the battery compartment with the correct polarity. 7. Place the slider into the cover plate. 8. Put the Receiver switch in the “OFF” position, to allow correct lineup for slider switch. 9. Make sure the Receiver and cover plate words “ON” and “UP” are on the same side. 10. Align the slider with the switch on the Receiver and couple the switch into the slider. 11. Align the screw holes. 12. Using the two (2) screws provided secure the cover plate to the Receiver. FPI Wall Switch & Cover Plate are white, not black as shown. 32 HZ54 Regency HorizonTM Gas Fireplace Fit side panel tab into slot Fit side panel tab into slot INSTALLATION OPTIONAL STAINLESS STEEL REFLECTIVE PANEL INSTALLATION Before you start: Stainless panels must be inspected for scratches and dimples prior to installation. All claims to be recorded at this time. Claims for damage after installation will not receive consideration. To protect the finish during installation and handling - cotton gloves MUST be worn at all times while handling the panels (even when removing protective coating). Stainless panels will discolor a little during normal operation. This is normal and should not be considered a defect. All hand and finger marks MUST be cleaned off with a soft cloth and a stainless steel cleaner. Most stainless steel cleaners leave a film/residue on the surface of the panels. Use an ammonia based cleaner (ie. glass cleaner) to remove this film before applying heat to the unit. Failure to do this will result in burn stain on panels which you will be unable to remove. This is not a warranty item. 1) Position the left side panel in place and fit the bottom tab into the slot at the bottom of the firebox as shown below. Repeat for right side panel. 2) Fit the back panel into position by clearing the pilot shield and fi t the tabs on the bottom left and right side of the back panel into the slots at the base of the firebox. Left Side Panel Secure the back panel in place by placing the brackets over the screws on the top of the inside left and right side of the firebox and tighten the screw to hold the bracket against the back panel. Back Panel Right side panel in position Left side panel in position Right side back panel tab fitted into slot Bracket shown in place on right side of the firebox INSTALLATION HZ54 Regency HorizonTM Gas Fireplace 33 INSTALLATION GLASS CRYSTALS OR OPTIONAL CERAMIC STONES INSTALLATION ON BURNER INSTALLATION HZ54 Glass Crystal/Optional Ceramic Spa Stone Quantity Glass Crystals only 2 bags *Ceramic Spa Stones 1 bag glass crystals + 140 ceramic spa stones * 1 bag of glass crystals must be used on burner when using ceramic spa stones. Evenly spread an appropriate amount of glass crystals or glass crystals plus optional ceramic stones over the burner. Ensure the crystals or stones do not excessively overlap as this will effect the flame pattern. NOTE: When installing, use either the supplied crystals or optional ceramic stones with one bag of glass crystals. Only the supplied and approved Cobalt Blue Glass Crystals or Optional Ceramic Stones are to be used with this fireplace. Use of any other type of glass crystals or stones can alter the unit's performance and is not covered under warranty. Glass Crystals shown on Burner Optional Ceramic Stones + Glass Crystals shown on burner. OPTIONAL PEBBLE INSTALLATION FOR FIREBOX BASE There are 2 optional pebble packages to choose from: 1) White River Pebbles 2) Natural River Pebbles Spread the pebbles evenly on the exposed base of the firebox. Pebbles are NOT to be placed anywhere on the burner or over top of the Cobalt Blue Glass Crystals or optional Ceramic Spa Stones. NOTE: Only the supplied and approved pebbles are to be used. Use of any other type of pebbles or material can create a danger and will void warranty. White River Pebbles shown surrounding the Burner Natural River Pebbles shown surrounding the Burner 34 HZ54 Regency HorizonTM Gas Fireplace INSTALLATION FACEPLATE & DOOR FRAME OVERLAY INSTALLATION 1) Install the door frame overlay by hooking the top flange over top of 3) Secure the left side mounting bracket to the backside of the faceplate the glass door, push in the bottom of the door frame overlay to secure as shown below. Use 3 screws supplied to secure the mounting in place. bracket in place. Repeat for right side. Door Frame Glass Door Left SideMounting Bracket Mounting Bracket shown in place Magnet Position Overlay NOTE: Ensure that the faceplate is positioned correctly when installing the mounting brackets to the faceplate. There is a top and bottom, the top of the faceplate has 4 tabs whereas the bottom only has 2 as shown in the diagram below. 2) Place 2 of the supplied magnets on the lower corners of the Door Frame Overlay, this will keep the Faceplate in postion after it has been installed. I...