Vendor Requirements The manufacturer of the COP shall be certified to the international standard ISO 9001. The vendor shall have the ability to pre-assemble the COP primary with a pressure instrument (transmitter), perform a leak-test and calibrate the unit before shipping. The vendor shall have the ability to provide technical support for the COP primary element and the pressure instrument. When a pressure instrument is supplied with the COP, each pressure instrument shall be individually teste
Now, you can install a single instrument without the hassles you face when you try to use separate equipment for automation and measurement operations at remote sites. The ControlWave XFC package features the following: • ControlWave family platform that is pre-programmed to meet API 21.1 requirements for a two-run metering and regulating station • High performance, smart multivariable transducer assembly is a separate component that can be removed and replaced independently of the electronic