Iniciar sesión:
Votos - 3, Puntuación media: 4.3 ( )

Manual de usuario Antunes, AJ, modelo VCT-20

Fabricar: Antunes, AJ
Tamaño del archivo: 1.6 mb
Nombre del archivo:
Idioma del manual:en
Enlace gratuito para este manual disponible en la parte inferior de la página



Resumen del manual


To reset this thermostat, allow sufficient time (10-15 minutes) for the unit to cool down, then fully depress the reset button located at the rear of the unit (Figure 5). If the unit requires continuous resetting, contact your Roundup authorized service agency. CONVEYOR INTERLOCK SWITCH A conveyor interlock switch is located on top of the unit under the heat shield (Figure 4). The conveyors will not rotate unless the heat shield is in place and interlock switch is activated (depressed). Bun Thickness Adjustment Controls (see Figure 6) 123451 = 1/2"(12.7mm) 2 = 5/8"(15.9mm) 4 = 3/4"(19.1mm) 5 =13/16"(20.6mm) 6 = 7/8"(22.2mm) THICKNESSTHICKNESS12345663 =11/16"(17.5mm) Hi-Limit Reset Temperature Control Rocker Switch Bun Landing Area Figure 5. Toaster Controls 123451 = 1/2"(12.7mm) 2 = 5/8"(15.9mm) 4 = 3/4"(19.1mm) 5 =13/16"(20.6mm) 6 = 7/8"(22.2mm) THICKNESSTHICKNESS12345663 =11/16"(17.5mm) Figure 6. Bun Thickness Adjustment Controls MAINTENANCE WARNING Turn the unit off, disconnect the power source and allow the unit to cool down before performing any service or maintenance on the unit. Heat Shield Maintenance Schedule DAILY 1. Turn off power to the toaster. 2. When the toaster is cool, follow the procedures under Cleaning the Release Sheet. 3. Remove heat shield and bun chute. Wash in back sink, sanitize and rinse. 4. Wipe down the outside of the toaster with a slightly damp cloth and allow to air dry. Cleaning the Release Sheet 1. Turn the rocker switch to off, unplug the unit and allow it to cool down. 2. Put on protective gloves. Remove heat shield and release sheet (Figure 7). 3. Wipe release sheet on both sides with a clean, sanitized towel. 4. Remove front and rear conveyor cover assys. (Figure 4). Wipe exterior of conveyor belt with a clean, sanitized towel. 5. Install front and rear cover assys. (Figure 4) then turn toaster on. Count to 10, then turn toaster off. Remove front and rear cover assys. and wipe new section of belt. Re-install the front and rear cover assemblies. 6. Install the release sheet by draping it over both sides of the platen with the crease centered directly on the platen (Figure 7). 7. Install the heat shield (Figure 7). The heat shield clips fit over the tip of the platen and retain the release sheet. IMPORTANT: Make sure heat shield assy. is activating (depressing) the conveyor interlock switch (see Figure 7). The conveyors will not rotate unless the heat shield is in place and interlock switch is activated (depressed). Release Sheet Platen Interlock Switch Figure 7. Removing/Installing Release Sheet NOTE: Check the release sheet to make sure it is not caught in the conveyor. Additional release sheets can be obtained through your authorized service agency under part no. 7000110 (3 pack) or 7000111 (10 pack). Conveyor Belts–Removing, Servicing & Replacing REMOVING THE CONVEYOR BELT 1. Turn the rocker switch to off, unplug the unit and allow it to cool down. 2. Remove the heat shield, front and rear conveyor covers and release sheet (Figure 4). NOTE: When replacing conveyor belt, it is recommended that the release sheet cleaning procedures be performed. 3. Set both compression knobs to: 6 = 7/8” (22.2 mm). 4. Disconnect the conveyor belt by squeezing any two links together and unhooking both ends of one link (Figure 8). A needle-nose pliers may be required. Remove conveyor belt. NOTE: With conveyor belt removed, the tensioner assemblies (4, page 24) and slide rails (40, page 24) can be replaced. CAUTION To prevent damage to the unit, do not use abrasive cleaners on the release sheet. SERVICING CONVEYOR BELTS After a period of time, the conveyor belt links will wear and the conveyor belt will stretch. This will eventually cause the conveyor to jam as it rotates on the sprockets. This is easily remedied by removing one or more conveyor links from each side of the belt. There are four 1/2” pitch links on each conveyor belt. The rest of the links are 3/4”. 1. Remove conveyor belt as described previously on page 10. 2. To shorten a stretched conveyor belt, remove one 1/2” link from the belt. 3. Reassemble the belt to the sprockets as described below. NOTE: If the belt is too short (tight) to be reassembled, remove an additional 1/2” link and install a 3/4” link. This will make the conveyor belt 1/4” shorter and enable it to be reassembled. IMPORTANT: This is not covered under warranty. It is a user responsibility. REPLACING CONVEYOR BELTS 1. Remove old conveyor belt as described previously on page 10. 2. Place replacement conveyor belt on top sprockets. Check for correct positioning (Figure 8). NOTE: Install conveyor belt so that the ends of the hooks are facing down. 3. Wrap conveyor belt around lower sprockets and connect by hooking both ends of the belt back together. A needle-nose pliers may be required. 4. Re-intall front and rear conveyor covers, release sheet and heat shield. Replacing Spring Tensioners 1. Remove acorn nuts (Figure 9). 2. Remove old spring tensioner assy. 3. ...

Otros modelos de este manual:
Tostadores - VCT-50 (1.6 mb)
Tostadores - VCT-25 (1.6 mb)

Comentarios



Tu reseña
Tu nombre:
Introduzca dos números de la imagen:
capcha





Categoría