![](/images/flag/s/en.gif)
For assistance or additional information, consult a qualified installer, service agency or the gas supplier. • BWC120 This boiler requires a special venting system. Read these • BWC151 instructions carefully before installing. • BWC150 • BWC225 Manufacturer of Hydronic Heating Products P.O. Box 14818 3633 I. Street Philadelphia, PA 19134 Tel: (215) 535-8900 • Fax: (215) 535-9736 • Table of Contents A. Vent System Design 2 B. Assembly of CPVC/PVC Concentric Venting 14 C. Condensate Trap and Drain