Due to air in the faucet, the spray pattern may be unattractive for the first 10 - 15 uses after installation or service. 32110XX1/32112XX1 only: pull the temperature lever forward to make the water cooler, backward to make it warmer. 3 4 1 2 Temperature adjustment - 32111XX1 / 32113XX1 only Turn the water supplies off (1). Disconnect the faucet power cable from the battery pack or AC power pack (2). Remove the screw from the rear of the faucet (3). 3 2 1 Remove the faucet body (1). Turn the tem
brass holder • Glass cup • Durable nylon bristles Available Finishes Chrome 06094000 Oil Rubbed Bronze 06094620 Brushed Nickel 06094820 Polished Nickel 06094830 Rubbed Bronze 06094920 14V 2 78" J I w ï'/l" V J. -5/8"-►! The measurements shown are for reference only. Products and specifications shown are subject to change without notice. Specification sheet revised 1/2009
out notice. Specification sheet revised 4/2008 Product Features • Solid brass holder • Glass cup • Brush with durable nylon bristles Available Finishes Chrome Brushed Nickel 40522XX0 40522000 40522820
rear cover To check the product suitability for commercial and multiple installations, please contact Triton's specification advisory service before installation. Telephone: 0870 067 3767 Facsimile: 0870 067 3334 E mail: technical@tritonshowers.co.uk Combi HP thermostatic mixer shower INTRODUCTION This book contains all the necessary fitting and operating instructions for your Triton high pressure thermostatic mixer shower. Please read them carefully. Please read through the whole of thi
Make sure SEAL WASHER (3) and FRICTION WASHER (4) are installed. Do not tighten fully. 3. Insert the DOWN TUBE (5) into the SPUD COUPLING NUT (2) and push it down. Note: If cutting Down Tube (5) to size, note that Critical Line (C/L) on Vacuum Breaker must typically be 6" (152mm) above fixture. Consult Code for details. Fig.3 CENTER LINE OF FIXTURE SPUD FINISHED WALL FILE EDGES SOLDER ADAPTER ADAPTER 32mm (1-1/4) A (A-B)= BC CLEAN Fig. 4 Fig. 4a Fig. 4b Fig. 4c 1 1 4 2 3 TEFLON TAPE FINISHED WAL
B. Fig. A. Fig. B. 2 DRAIN OUTLET 1 3 4 REAR OF SINK DRAIN BODY 4 WHITE FOAM GASKET NOT VISIBLE DRAIN FLANGE 1 DOWN M965015 REV.1.7 Connect HOT water supply to inlet of left SHANK and COLD water supply to right SHANK using sealant, appropriate connectors, and COUPLING NUTS. Connect 1-1/4” O.D. tailpiece on POP-UP DRAIN to waste outlet. Thread TEE BODY (4) to SPOUT SHANK (5). Thread HOSE CONNECTOR (6, 6A) to VALVE CONNECTIONS (7, 7A). 9 Connect water supply to VALVE BODIES (1,1A) with 1/2" IPS FL
5,819,789 HOT COLD Turn off hot and cold water CAUTION supplies before beginning. Installation Instructions 2064.451 ROUGHING-IN DIMENSIONS 1 2" D. (52mm) 1" (25mm) 2" MIN. (51mm) 3" MAX. (76mm) MAX. FINISHED WALL FINISHED WALL 2" D. (52mm) 9-1/4" (235mm) 1/2" NPT INLETS 8" (203mm) 4" CROSS (102mm) HANDLE 1 INSTALL VALVE BODY Determine where the finished wall location will be. This measurement is very important! Note: The rough-in measurement from the finished wall is; 2" minimum and 3" maximum.