The RKF comes with using the supplied industrial grade two sided adhesive wherever you either a clock or thermometer, one extra rubber compression ring, two would like, or using the supplied 1/4” x 20 screw for bolt down 2) To remove the clock pry slowly under the edge of the clock with the long flat ®RKF Roadking -All models 94’-07’ ®TOCS Installs to any flat surface or Roadking tank panel screws, one clear plastic spacer, one battery replacement tool and ® applications like the Roadking tank p
Make sure that the clock does not fall and become damaged. 3) Remove the two rear screws, separating the two mount halves. 4) Place the handlebar mount halves in the position of your choice on the bars (keep away from curves or areas the bar may not be a consistent thickness), re-insert the supplied screws and tighten gently and evenly (for the mount to tighten properly there should be a small gap between the two halves, no bar is the same so the gap will vary - do not over-tighten ). 5) Loosen